{"id":149730,"date":"2018-12-19T23:57:37","date_gmt":"2018-12-19T16:57:37","guid":{"rendered":"https:\/\/setkab.go.id\/?p=149730"},"modified":"2018-12-20T14:14:50","modified_gmt":"2018-12-20T07:14:50","slug":"govt-begins-java-1-pltgu-construction-in-karawang","status":"publish","type":"post","link":"https:\/\/setkab.go.id\/en\/govt-begins-java-1-pltgu-construction-in-karawang\/","title":{"rendered":"Gov\u0092t Begins Java-1 PLTGU Construction in Karawang"},"content":{"rendered":"<div id=\"attachment_149731\" style=\"width: 310px\" class=\"wp-caption alignleft\"><a href=\"https:\/\/setkab.go.id\/wp-content\/uploads\/2018\/12\/PLTGU-300x217-1.jpg\" rel=\"attachment wp-att-149731\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-149731\" class=\"size-medium wp-image-149731\" src=\"https:\/\/setkab.go.id\/wp-content\/uploads\/2018\/12\/PLTGU-300x217-1-300x217.jpg\" alt=\"Coordinating Minister for the Economy Darmin Nasution, Managing Director of Pertamina, and other officials press the button marking the start of construction of Java 1 PLTGU, in Karawang, West Java, Wednesday (19\/12). \" width=\"300\" height=\"217\" srcset=\"https:\/\/setkab.go.id\/wp-content\/uploads\/2018\/12\/PLTGU-300x217-1.jpg 300w, https:\/\/setkab.go.id\/wp-content\/uploads\/2018\/12\/PLTGU-300x217-1-150x109.jpg 150w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><p id=\"caption-attachment-149731\" class=\"wp-caption-text\">Coordinating Minister for the Economy Darmin Nasution, Managing Director of Pertamina, and other officials press the button marking the start of construction of Java 1 PLTGU, in Karawang, West Java, Wednesday (19\/12).<\/p><\/div>\n<p>Coordinating Minister for the Economy Darmin Nasution on Wednesday (19\/12) inaugurated the construction of gas infrastructure development project and the Java-1 Gas and Steam Power Plant (PLTGU) in Cilamaya Village, Karawang Regency, West Java Province.<\/p>\n<p>The power plant will have the capacity of up to 1,760 megawatt (MW) and use 400 million cubic feet of Liquefied Natural Gas (LNG) per day sent directly from Tangguh Gas Field in Bintuni Bay, West Papua. <!--more--><\/p>\n<p>According to Darmin, the power plant is important to improve reliability of the Java-Bali power system and will also become the first integrated power plant in Asia and the largest in Southeast Asia that combines the LNG business and independent power producer business (IPP).<\/p>\n<p>\u0093We should be grateful and proud of this important project (the Java-1 PLTGU), or more commonly called the IPP Jawa-1 PLTGU project &#8211; the first integrated power plant in Asia and the largest in Southeast Asia,\u0094 Darmin said, adding that the Government has set this Java-1 PLTGU project not only as a National Strategic Project, but also a priority project from the Committee for the Acceleration of Priority Infrastructure Provision (KPPIP).<\/p>\n<p>\u0093Therefore, the KPPIP fully supports immediate completion of its construction. In the process of preparing for Financial Closing, the KPPIP has facilitated settlement of spatial suitability, land acquisition, and permit issuance,\u0094 Darmin said.<\/p>\n<p>To that end, Darmin also expressed hope that the development of strategic projects such as the IPP Java-1 PLTGU project will be followed by the development of other strategic infrastructure in the country with high quality, professionalism, and speed.<\/p>\n<p>\u0093Gas infrastructure is needed to support the development of gas power plants throughout Indonesia,\u0094 he said.<\/p>\n<p>The Minister also called on state-owned oil and gas company PT Pertamina, state-owned electricity company PT PLN, and all parties involved to carry out this project in accordance with the planned steps, so that the development will run smoothly and meet the set time.<\/p>\n<p>Meanwhile, PT Pertamina Managing Director Nicke Widyawati said that the gas power plant is one of the Government\u0092s policies to boost the use of clean energy until 2025. \u0093The project is a strategic measure that will materialize the Government\u0092s commitment for the use of new and renewable energy in the future,\u0094 she said.<\/p>\n<p>Nicke also expressed belief that this project will create a vast multiplier effect for the economy in Karawang, Bekasi, and the surrounding areas, one of which through the creation of job opportunities for 5,000 people during the construction period and approximately 200 people when the power plant is in operation.<\/p>\n<p>More than 20 companies &#8211; both domestic and foreign companies &#8211; are involved in the project, with a total investment value amounting to US$1.8 billion or around Rp26 trillion.<\/p>\n<p><strong>(Public Relations of Coordinating Ministry for the Economy\/ES)<\/strong><\/p>\n<p><strong>\u00a0<\/strong>Translated by: Muhardi<\/p>\n<p>Edited by: M. Ersan Pamungkas<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Coordinating Minister for the Economy Darmin Nasution on Wednesday (19\/12) inaugurated the construction of gas infrastructure development project and the Java-1 Gas and Steam Power Plant (PLTGU) in Cilamaya Village, Karawang Regency, West Java Province. The power plant will have the capacity of up to 1,760 megawatt (MW) and use 400 million cubic feet of [&hellip;]<\/p>\n","protected":false},"author":43,"featured_media":149731,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[77],"tags":[],"class_list":["post-149730","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v24.1 (Yoast SEO v26.1.1) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Gov\u0092t Begins Java-1 PLTGU Construction in Karawang - Sekretariat Kabinet Republik Indonesia<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/setkab.go.id\/en\/govt-begins-java-1-pltgu-construction-in-karawang\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Gov\u0092t Begins Java-1 PLTGU Construction in Karawang - Sekretariat Kabinet Republik Indonesia\" \/>\n<meta property=\"og:description\" content=\"Coordinating Minister for the Economy Darmin Nasution on Wednesday (19\/12) inaugurated the construction of gas infrastructure development project and the Java-1 Gas and Steam Power Plant (PLTGU) in Cilamaya Village, Karawang Regency, West Java Province. The power plant will have the capacity of up to 1,760 megawatt (MW) and use 400 million cubic feet of [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/setkab.go.id\/en\/govt-begins-java-1-pltgu-construction-in-karawang\/\" \/>\n<meta property=\"og:site_name\" content=\"Sekretariat Kabinet Republik Indonesia\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/id-id.facebook.com\/Setkabgoid\" \/>\n<meta property=\"article:published_time\" content=\"2018-12-19T16:57:37+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2018-12-20T07:14:50+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/setkab.go.id\/wp-content\/uploads\/2018\/12\/PLTGU-300x217-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"300\" \/>\n\t<meta property=\"og:image:height\" content=\"217\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@setkabgoid\" \/>\n<meta name=\"twitter:site\" content=\"@setkabgoid\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"NewsArticle\",\"@id\":\"https:\/\/setkab.go.id\/en\/govt-begins-java-1-pltgu-construction-in-karawang\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/setkab.go.id\/en\/govt-begins-java-1-pltgu-construction-in-karawang\/\"},\"author\":{\"name\":\"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation\",\"@id\":\"https:\/\/setkab.go.id\/#\/schema\/person\/ccc9c04099be79c6aa9ed45cb3bf345e\"},\"headline\":\"Gov\u0092t Begins Java-1 PLTGU Construction in Karawang\",\"datePublished\":\"2018-12-19T16:57:37+00:00\",\"dateModified\":\"2018-12-20T07:14:50+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/setkab.go.id\/en\/govt-begins-java-1-pltgu-construction-in-karawang\/\"},\"wordCount\":508,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/setkab.go.id\/#organization\"},\"image\":{\"@id\":\"https:\/\/setkab.go.id\/en\/govt-begins-java-1-pltgu-construction-in-karawang\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/setkab.go.id\/wp-content\/uploads\/2018\/12\/PLTGU-300x217-1.jpg\",\"articleSection\":[\"News\"],\"inLanguage\":\"ENH\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/setkab.go.id\/en\/govt-begins-java-1-pltgu-construction-in-karawang\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/setkab.go.id\/en\/govt-begins-java-1-pltgu-construction-in-karawang\/\",\"url\":\"https:\/\/setkab.go.id\/en\/govt-begins-java-1-pltgu-construction-in-karawang\/\",\"name\":\"Gov\u0092t Begins Java-1 PLTGU Construction in Karawang - Sekretariat Kabinet Republik Indonesia\",\"isPartOf\":{\"@id\":\"https:\/\/setkab.go.id\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/setkab.go.id\/en\/govt-begins-java-1-pltgu-construction-in-karawang\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/setkab.go.id\/en\/govt-begins-java-1-pltgu-construction-in-karawang\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/setkab.go.id\/wp-content\/uploads\/2018\/12\/PLTGU-300x217-1.jpg\",\"datePublished\":\"2018-12-19T16:57:37+00:00\",\"dateModified\":\"2018-12-20T07:14:50+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/setkab.go.id\/en\/govt-begins-java-1-pltgu-construction-in-karawang\/#breadcrumb\"},\"inLanguage\":\"ENH\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/setkab.go.id\/en\/govt-begins-java-1-pltgu-construction-in-karawang\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ENH\",\"@id\":\"https:\/\/setkab.go.id\/en\/govt-begins-java-1-pltgu-construction-in-karawang\/#primaryimage\",\"url\":\"https:\/\/setkab.go.id\/wp-content\/uploads\/2018\/12\/PLTGU-300x217-1.jpg\",\"contentUrl\":\"https:\/\/setkab.go.id\/wp-content\/uploads\/2018\/12\/PLTGU-300x217-1.jpg\",\"width\":300,\"height\":217,\"caption\":\"Coordinating Minister for the Economy Darmin Nasution, Managing Director of Pertamina, and other officials press the button marking the start of construction of Java 1 PLTGU, in Karawang, West Java, Wednesday (19\/12).\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/setkab.go.id\/en\/govt-begins-java-1-pltgu-construction-in-karawang\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/setkab.go.id\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Gov\u0092t Begins Java-1 PLTGU Construction in Karawang\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/setkab.go.id\/#website\",\"url\":\"https:\/\/setkab.go.id\/\",\"name\":\"Sekretariat Kabinet Republik Indonesia\",\"description\":\"Kabinet Merah Putih\",\"publisher\":{\"@id\":\"https:\/\/setkab.go.id\/#organization\"},\"alternateName\":\"Setkab\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/setkab.go.id\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ENH\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/setkab.go.id\/#organization\",\"name\":\"Sekretariat Kabinet\",\"alternateName\":\"Setkab\",\"url\":\"https:\/\/setkab.go.id\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ENH\",\"@id\":\"https:\/\/setkab.go.id\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/05\/garuda.png\",\"contentUrl\":\"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/05\/garuda.png\",\"width\":720,\"height\":788,\"caption\":\"Sekretariat Kabinet\"},\"image\":{\"@id\":\"https:\/\/setkab.go.id\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/id-id.facebook.com\/Setkabgoid\",\"https:\/\/x.com\/setkabgoid\",\"https:\/\/www.instagram.com\/sekretariat.kabinet\/\",\"https:\/\/www.youtube.com\/channel\/UCey1BgbIUz6eVz2vywc2d7g\",\"https:\/\/id.wikipedia.org\/wiki\/Sekretariat_Kabinet_Republik_Indonesia\",\"https:\/\/www.tiktok.com\/@setkabgoid\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/setkab.go.id\/#\/schema\/person\/ccc9c04099be79c6aa9ed45cb3bf345e\",\"name\":\"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ENH\",\"@id\":\"https:\/\/setkab.go.id\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/8238a2781f78eec52de6cbadf268cdcab6067d59123790258ac87c2b257c0b3f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/8238a2781f78eec52de6cbadf268cdcab6067d59123790258ac87c2b257c0b3f?s=96&d=mm&r=g\",\"caption\":\"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation\"},\"sameAs\":[\"http:\/\/www.setkab.go.id\"],\"url\":\"https:\/\/setkab.go.id\/en\/author\/naster\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Gov\u0092t Begins Java-1 PLTGU Construction in Karawang - Sekretariat Kabinet Republik Indonesia","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/setkab.go.id\/en\/govt-begins-java-1-pltgu-construction-in-karawang\/","og_locale":"en_US","og_type":"article","og_title":"Gov\u0092t Begins Java-1 PLTGU Construction in Karawang - Sekretariat Kabinet Republik Indonesia","og_description":"Coordinating Minister for the Economy Darmin Nasution on Wednesday (19\/12) inaugurated the construction of gas infrastructure development project and the Java-1 Gas and Steam Power Plant (PLTGU) in Cilamaya Village, Karawang Regency, West Java Province. The power plant will have the capacity of up to 1,760 megawatt (MW) and use 400 million cubic feet of [&hellip;]","og_url":"https:\/\/setkab.go.id\/en\/govt-begins-java-1-pltgu-construction-in-karawang\/","og_site_name":"Sekretariat Kabinet Republik Indonesia","article_publisher":"https:\/\/id-id.facebook.com\/Setkabgoid","article_published_time":"2018-12-19T16:57:37+00:00","article_modified_time":"2018-12-20T07:14:50+00:00","og_image":[{"width":300,"height":217,"url":"https:\/\/setkab.go.id\/wp-content\/uploads\/2018\/12\/PLTGU-300x217-1.jpg","type":"image\/jpeg"}],"author":"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation","twitter_card":"summary_large_image","twitter_creator":"@setkabgoid","twitter_site":"@setkabgoid","twitter_misc":{"Written by":"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"NewsArticle","@id":"https:\/\/setkab.go.id\/en\/govt-begins-java-1-pltgu-construction-in-karawang\/#article","isPartOf":{"@id":"https:\/\/setkab.go.id\/en\/govt-begins-java-1-pltgu-construction-in-karawang\/"},"author":{"name":"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation","@id":"https:\/\/setkab.go.id\/#\/schema\/person\/ccc9c04099be79c6aa9ed45cb3bf345e"},"headline":"Gov\u0092t Begins Java-1 PLTGU Construction in Karawang","datePublished":"2018-12-19T16:57:37+00:00","dateModified":"2018-12-20T07:14:50+00:00","mainEntityOfPage":{"@id":"https:\/\/setkab.go.id\/en\/govt-begins-java-1-pltgu-construction-in-karawang\/"},"wordCount":508,"commentCount":0,"publisher":{"@id":"https:\/\/setkab.go.id\/#organization"},"image":{"@id":"https:\/\/setkab.go.id\/en\/govt-begins-java-1-pltgu-construction-in-karawang\/#primaryimage"},"thumbnailUrl":"https:\/\/setkab.go.id\/wp-content\/uploads\/2018\/12\/PLTGU-300x217-1.jpg","articleSection":["News"],"inLanguage":"ENH","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/setkab.go.id\/en\/govt-begins-java-1-pltgu-construction-in-karawang\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/setkab.go.id\/en\/govt-begins-java-1-pltgu-construction-in-karawang\/","url":"https:\/\/setkab.go.id\/en\/govt-begins-java-1-pltgu-construction-in-karawang\/","name":"Gov\u0092t Begins Java-1 PLTGU Construction in Karawang - Sekretariat Kabinet Republik Indonesia","isPartOf":{"@id":"https:\/\/setkab.go.id\/#website"},"primaryImageOfPage":{"@id":"https:\/\/setkab.go.id\/en\/govt-begins-java-1-pltgu-construction-in-karawang\/#primaryimage"},"image":{"@id":"https:\/\/setkab.go.id\/en\/govt-begins-java-1-pltgu-construction-in-karawang\/#primaryimage"},"thumbnailUrl":"https:\/\/setkab.go.id\/wp-content\/uploads\/2018\/12\/PLTGU-300x217-1.jpg","datePublished":"2018-12-19T16:57:37+00:00","dateModified":"2018-12-20T07:14:50+00:00","breadcrumb":{"@id":"https:\/\/setkab.go.id\/en\/govt-begins-java-1-pltgu-construction-in-karawang\/#breadcrumb"},"inLanguage":"ENH","potentialAction":[{"@type":"ReadAction","target":["https:\/\/setkab.go.id\/en\/govt-begins-java-1-pltgu-construction-in-karawang\/"]}]},{"@type":"ImageObject","inLanguage":"ENH","@id":"https:\/\/setkab.go.id\/en\/govt-begins-java-1-pltgu-construction-in-karawang\/#primaryimage","url":"https:\/\/setkab.go.id\/wp-content\/uploads\/2018\/12\/PLTGU-300x217-1.jpg","contentUrl":"https:\/\/setkab.go.id\/wp-content\/uploads\/2018\/12\/PLTGU-300x217-1.jpg","width":300,"height":217,"caption":"Coordinating Minister for the Economy Darmin Nasution, Managing Director of Pertamina, and other officials press the button marking the start of construction of Java 1 PLTGU, in Karawang, West Java, Wednesday (19\/12)."},{"@type":"BreadcrumbList","@id":"https:\/\/setkab.go.id\/en\/govt-begins-java-1-pltgu-construction-in-karawang\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/setkab.go.id\/en\/"},{"@type":"ListItem","position":2,"name":"Gov\u0092t Begins Java-1 PLTGU Construction in Karawang"}]},{"@type":"WebSite","@id":"https:\/\/setkab.go.id\/#website","url":"https:\/\/setkab.go.id\/","name":"Sekretariat Kabinet Republik Indonesia","description":"Kabinet Merah Putih","publisher":{"@id":"https:\/\/setkab.go.id\/#organization"},"alternateName":"Setkab","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/setkab.go.id\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ENH"},{"@type":"Organization","@id":"https:\/\/setkab.go.id\/#organization","name":"Sekretariat Kabinet","alternateName":"Setkab","url":"https:\/\/setkab.go.id\/","logo":{"@type":"ImageObject","inLanguage":"ENH","@id":"https:\/\/setkab.go.id\/#\/schema\/logo\/image\/","url":"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/05\/garuda.png","contentUrl":"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/05\/garuda.png","width":720,"height":788,"caption":"Sekretariat Kabinet"},"image":{"@id":"https:\/\/setkab.go.id\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/id-id.facebook.com\/Setkabgoid","https:\/\/x.com\/setkabgoid","https:\/\/www.instagram.com\/sekretariat.kabinet\/","https:\/\/www.youtube.com\/channel\/UCey1BgbIUz6eVz2vywc2d7g","https:\/\/id.wikipedia.org\/wiki\/Sekretariat_Kabinet_Republik_Indonesia","https:\/\/www.tiktok.com\/@setkabgoid"]},{"@type":"Person","@id":"https:\/\/setkab.go.id\/#\/schema\/person\/ccc9c04099be79c6aa9ed45cb3bf345e","name":"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation","image":{"@type":"ImageObject","inLanguage":"ENH","@id":"https:\/\/setkab.go.id\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/8238a2781f78eec52de6cbadf268cdcab6067d59123790258ac87c2b257c0b3f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/8238a2781f78eec52de6cbadf268cdcab6067d59123790258ac87c2b257c0b3f?s=96&d=mm&r=g","caption":"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation"},"sameAs":["http:\/\/www.setkab.go.id"],"url":"https:\/\/setkab.go.id\/en\/author\/naster\/"}]}},"_links":{"self":[{"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/posts\/149730","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/users\/43"}],"replies":[{"embeddable":true,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/comments?post=149730"}],"version-history":[{"count":1,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/posts\/149730\/revisions"}],"predecessor-version":[{"id":149732,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/posts\/149730\/revisions\/149732"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/media\/149731"}],"wp:attachment":[{"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/media?parent=149730"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/categories?post=149730"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/tags?post=149730"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}