{"id":163668,"date":"2019-07-18T15:51:47","date_gmt":"2019-07-18T08:51:47","guid":{"rendered":"https:\/\/setkab.go.id\/?p=163668"},"modified":"2019-07-18T15:51:47","modified_gmt":"2019-07-18T08:51:47","slug":"four-waste-based-power-plants-to-finish-construction-this-year","status":"publish","type":"post","link":"https:\/\/setkab.go.id\/en\/four-waste-based-power-plants-to-finish-construction-this-year\/","title":{"rendered":"Four Waste-Based Power Plants to Finish Construction This Year"},"content":{"rendered":"<p><a href=\"https:\/\/setkab.go.id\/wp-content\/uploads\/2019\/07\/Grafis-PLTSa-2.jpg\" rel=\"attachment wp-att-163670\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-163670\" src=\"https:\/\/setkab.go.id\/wp-content\/uploads\/2019\/07\/Grafis-PLTSa-2-300x300.jpg\" alt=\"Grafis-PLTSa\" width=\"300\" height=\"300\" srcset=\"https:\/\/setkab.go.id\/wp-content\/uploads\/2019\/07\/Grafis-PLTSa-2-300x300.jpg 300w, https:\/\/setkab.go.id\/wp-content\/uploads\/2019\/07\/Grafis-PLTSa-2-150x150.jpg 150w, https:\/\/setkab.go.id\/wp-content\/uploads\/2019\/07\/Grafis-PLTSa-2-768x768.jpg 768w, https:\/\/setkab.go.id\/wp-content\/uploads\/2019\/07\/Grafis-PLTSa-2-1024x1024.jpg 1024w, https:\/\/setkab.go.id\/wp-content\/uploads\/2019\/07\/Grafis-PLTSa-2-600x600.jpg 600w, https:\/\/setkab.go.id\/wp-content\/uploads\/2019\/07\/Grafis-PLTSa-2.jpg 1080w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a>The construction of waste-based power plant (PLTSa) in four cities &#8211; Surabaya, Jakarta, Bekasi, and Solo &#8211; is projected to finish this year, Ministry of Energy and Mineral Resources (ESDM) has reported.<\/p>\n<p>&#8220;The construction of those power plants, including the one in Bali, is monitored directly by President Joko Widodo,&#8221; said the Ministry\u0092s Head of the Communication Bureau Agung Pribadi on Thursday (18\/7). <!--more--><\/p>\n<p>According to Agung, the Ministry has set target of building 12 PLTSa in the period of 2019-2022 to produce electricity up to 234 megawatts from around 16,000 tons of waste per day.<\/p>\n<p>The power plant in Surabaya &#8211; with the capacity of 10 megawatt and is generated from 1,500 tons waste per day, he added, will be the first waste-based power plant to operate with an investment of around USD49.86 million.<\/p>\n<p>In the meantime, Agung added that the power plant in Bekasi is developed with an investment of around USD120 million and is expected to produce 9 megawatts of electricity, while the power plants in Surakarta (10 megawatts), Palembang (20 megawatts), and Denpasar (20 megawatts) respectively have a total investment of USD297.82 million and will process 2.800 tons waste per day.<\/p>\n<p>Meanwhile, Jakarta\u0092s power plant will produce electricity up to 38 megawatts with an investment of US$345.8 million and the one in Bandung with the capacity of 29 megawatts has an investment of USD245 million.<\/p>\n<p>Power plants in Makassar, Manado, and South Tangerang each has a capacity of 20 megawatts with an investment of US$120 million each.<\/p>\n<p>Agung further said that the development of waste-based power plant will create a sustainable environment which in line with the President\u0092s nine-point development plan Nawacita.<\/p>\n<p>&#8220;The development of PLTAs will not only focus on providing environmentally friendly energy source, but also aims to improve waste management to create a healthier environment,&#8221; Agung said. (Public Relations of Ministry of ESDM \/ ES)<\/p>\n<p>Translated by: Estu Widyamurti<br \/>\nEdited by: M. Ersan Pamungkas<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The construction of waste-based power plant (PLTSa) in four cities &#8211; Surabaya, Jakarta, Bekasi, and Solo &#8211; is projected to finish this year, Ministry of Energy and Mineral Resources (ESDM) has reported. &#8220;The construction of those power plants, including the one in Bali, is monitored directly by President Joko Widodo,&#8221; said the Ministry\u0092s Head of [&hellip;]<\/p>\n","protected":false},"author":43,"featured_media":163669,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[77],"tags":[],"class_list":["post-163668","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v24.1 (Yoast SEO v26.1.1) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Four Waste-Based Power Plants to Finish Construction This Year - Sekretariat Kabinet Republik Indonesia<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/setkab.go.id\/en\/four-waste-based-power-plants-to-finish-construction-this-year\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Four Waste-Based Power Plants to Finish Construction This Year - Sekretariat Kabinet Republik Indonesia\" \/>\n<meta property=\"og:description\" content=\"The construction of waste-based power plant (PLTSa) in four cities &#8211; Surabaya, Jakarta, Bekasi, and Solo &#8211; is projected to finish this year, Ministry of Energy and Mineral Resources (ESDM) has reported. &#8220;The construction of those power plants, including the one in Bali, is monitored directly by President Joko Widodo,&#8221; said the Ministry\u0092s Head of [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/setkab.go.id\/en\/four-waste-based-power-plants-to-finish-construction-this-year\/\" \/>\n<meta property=\"og:site_name\" content=\"Sekretariat Kabinet Republik Indonesia\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/id-id.facebook.com\/Setkabgoid\" \/>\n<meta property=\"article:published_time\" content=\"2019-07-18T08:51:47+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/setkab.go.id\/wp-content\/uploads\/2019\/07\/Grafis-PLTSa-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1080\" \/>\n\t<meta property=\"og:image:height\" content=\"1080\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@setkabgoid\" \/>\n<meta name=\"twitter:site\" content=\"@setkabgoid\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"NewsArticle\",\"@id\":\"https:\/\/setkab.go.id\/en\/four-waste-based-power-plants-to-finish-construction-this-year\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/setkab.go.id\/en\/four-waste-based-power-plants-to-finish-construction-this-year\/\"},\"author\":{\"name\":\"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation\",\"@id\":\"https:\/\/setkab.go.id\/#\/schema\/person\/ccc9c04099be79c6aa9ed45cb3bf345e\"},\"headline\":\"Four Waste-Based Power Plants to Finish Construction This Year\",\"datePublished\":\"2019-07-18T08:51:47+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/setkab.go.id\/en\/four-waste-based-power-plants-to-finish-construction-this-year\/\"},\"wordCount\":317,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/setkab.go.id\/#organization\"},\"image\":{\"@id\":\"https:\/\/setkab.go.id\/en\/four-waste-based-power-plants-to-finish-construction-this-year\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/setkab.go.id\/wp-content\/uploads\/2019\/07\/Grafis-PLTSa-1.jpg\",\"articleSection\":[\"News\"],\"inLanguage\":\"ENH\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/setkab.go.id\/en\/four-waste-based-power-plants-to-finish-construction-this-year\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/setkab.go.id\/en\/four-waste-based-power-plants-to-finish-construction-this-year\/\",\"url\":\"https:\/\/setkab.go.id\/en\/four-waste-based-power-plants-to-finish-construction-this-year\/\",\"name\":\"Four Waste-Based Power Plants to Finish Construction This Year - Sekretariat Kabinet Republik Indonesia\",\"isPartOf\":{\"@id\":\"https:\/\/setkab.go.id\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/setkab.go.id\/en\/four-waste-based-power-plants-to-finish-construction-this-year\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/setkab.go.id\/en\/four-waste-based-power-plants-to-finish-construction-this-year\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/setkab.go.id\/wp-content\/uploads\/2019\/07\/Grafis-PLTSa-1.jpg\",\"datePublished\":\"2019-07-18T08:51:47+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/setkab.go.id\/en\/four-waste-based-power-plants-to-finish-construction-this-year\/#breadcrumb\"},\"inLanguage\":\"ENH\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/setkab.go.id\/en\/four-waste-based-power-plants-to-finish-construction-this-year\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ENH\",\"@id\":\"https:\/\/setkab.go.id\/en\/four-waste-based-power-plants-to-finish-construction-this-year\/#primaryimage\",\"url\":\"https:\/\/setkab.go.id\/wp-content\/uploads\/2019\/07\/Grafis-PLTSa-1.jpg\",\"contentUrl\":\"https:\/\/setkab.go.id\/wp-content\/uploads\/2019\/07\/Grafis-PLTSa-1.jpg\",\"width\":1080,\"height\":1080},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/setkab.go.id\/en\/four-waste-based-power-plants-to-finish-construction-this-year\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/setkab.go.id\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Four Waste-Based Power Plants to Finish Construction This Year\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/setkab.go.id\/#website\",\"url\":\"https:\/\/setkab.go.id\/\",\"name\":\"Sekretariat Kabinet Republik Indonesia\",\"description\":\"Kabinet Merah Putih\",\"publisher\":{\"@id\":\"https:\/\/setkab.go.id\/#organization\"},\"alternateName\":\"Setkab\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/setkab.go.id\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ENH\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/setkab.go.id\/#organization\",\"name\":\"Sekretariat Kabinet\",\"alternateName\":\"Setkab\",\"url\":\"https:\/\/setkab.go.id\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ENH\",\"@id\":\"https:\/\/setkab.go.id\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/05\/garuda.png\",\"contentUrl\":\"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/05\/garuda.png\",\"width\":720,\"height\":788,\"caption\":\"Sekretariat Kabinet\"},\"image\":{\"@id\":\"https:\/\/setkab.go.id\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/id-id.facebook.com\/Setkabgoid\",\"https:\/\/x.com\/setkabgoid\",\"https:\/\/www.instagram.com\/sekretariat.kabinet\/\",\"https:\/\/www.youtube.com\/channel\/UCey1BgbIUz6eVz2vywc2d7g\",\"https:\/\/id.wikipedia.org\/wiki\/Sekretariat_Kabinet_Republik_Indonesia\",\"https:\/\/www.tiktok.com\/@setkabgoid\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/setkab.go.id\/#\/schema\/person\/ccc9c04099be79c6aa9ed45cb3bf345e\",\"name\":\"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ENH\",\"@id\":\"https:\/\/setkab.go.id\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/8238a2781f78eec52de6cbadf268cdcab6067d59123790258ac87c2b257c0b3f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/8238a2781f78eec52de6cbadf268cdcab6067d59123790258ac87c2b257c0b3f?s=96&d=mm&r=g\",\"caption\":\"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation\"},\"sameAs\":[\"http:\/\/www.setkab.go.id\"],\"url\":\"https:\/\/setkab.go.id\/en\/author\/naster\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Four Waste-Based Power Plants to Finish Construction This Year - Sekretariat Kabinet Republik Indonesia","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/setkab.go.id\/en\/four-waste-based-power-plants-to-finish-construction-this-year\/","og_locale":"en_US","og_type":"article","og_title":"Four Waste-Based Power Plants to Finish Construction This Year - Sekretariat Kabinet Republik Indonesia","og_description":"The construction of waste-based power plant (PLTSa) in four cities &#8211; Surabaya, Jakarta, Bekasi, and Solo &#8211; is projected to finish this year, Ministry of Energy and Mineral Resources (ESDM) has reported. &#8220;The construction of those power plants, including the one in Bali, is monitored directly by President Joko Widodo,&#8221; said the Ministry\u0092s Head of [&hellip;]","og_url":"https:\/\/setkab.go.id\/en\/four-waste-based-power-plants-to-finish-construction-this-year\/","og_site_name":"Sekretariat Kabinet Republik Indonesia","article_publisher":"https:\/\/id-id.facebook.com\/Setkabgoid","article_published_time":"2019-07-18T08:51:47+00:00","og_image":[{"width":1080,"height":1080,"url":"https:\/\/setkab.go.id\/wp-content\/uploads\/2019\/07\/Grafis-PLTSa-1.jpg","type":"image\/jpeg"}],"author":"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation","twitter_card":"summary_large_image","twitter_creator":"@setkabgoid","twitter_site":"@setkabgoid","twitter_misc":{"Written by":"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"NewsArticle","@id":"https:\/\/setkab.go.id\/en\/four-waste-based-power-plants-to-finish-construction-this-year\/#article","isPartOf":{"@id":"https:\/\/setkab.go.id\/en\/four-waste-based-power-plants-to-finish-construction-this-year\/"},"author":{"name":"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation","@id":"https:\/\/setkab.go.id\/#\/schema\/person\/ccc9c04099be79c6aa9ed45cb3bf345e"},"headline":"Four Waste-Based Power Plants to Finish Construction This Year","datePublished":"2019-07-18T08:51:47+00:00","mainEntityOfPage":{"@id":"https:\/\/setkab.go.id\/en\/four-waste-based-power-plants-to-finish-construction-this-year\/"},"wordCount":317,"commentCount":0,"publisher":{"@id":"https:\/\/setkab.go.id\/#organization"},"image":{"@id":"https:\/\/setkab.go.id\/en\/four-waste-based-power-plants-to-finish-construction-this-year\/#primaryimage"},"thumbnailUrl":"https:\/\/setkab.go.id\/wp-content\/uploads\/2019\/07\/Grafis-PLTSa-1.jpg","articleSection":["News"],"inLanguage":"ENH","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/setkab.go.id\/en\/four-waste-based-power-plants-to-finish-construction-this-year\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/setkab.go.id\/en\/four-waste-based-power-plants-to-finish-construction-this-year\/","url":"https:\/\/setkab.go.id\/en\/four-waste-based-power-plants-to-finish-construction-this-year\/","name":"Four Waste-Based Power Plants to Finish Construction This Year - Sekretariat Kabinet Republik Indonesia","isPartOf":{"@id":"https:\/\/setkab.go.id\/#website"},"primaryImageOfPage":{"@id":"https:\/\/setkab.go.id\/en\/four-waste-based-power-plants-to-finish-construction-this-year\/#primaryimage"},"image":{"@id":"https:\/\/setkab.go.id\/en\/four-waste-based-power-plants-to-finish-construction-this-year\/#primaryimage"},"thumbnailUrl":"https:\/\/setkab.go.id\/wp-content\/uploads\/2019\/07\/Grafis-PLTSa-1.jpg","datePublished":"2019-07-18T08:51:47+00:00","breadcrumb":{"@id":"https:\/\/setkab.go.id\/en\/four-waste-based-power-plants-to-finish-construction-this-year\/#breadcrumb"},"inLanguage":"ENH","potentialAction":[{"@type":"ReadAction","target":["https:\/\/setkab.go.id\/en\/four-waste-based-power-plants-to-finish-construction-this-year\/"]}]},{"@type":"ImageObject","inLanguage":"ENH","@id":"https:\/\/setkab.go.id\/en\/four-waste-based-power-plants-to-finish-construction-this-year\/#primaryimage","url":"https:\/\/setkab.go.id\/wp-content\/uploads\/2019\/07\/Grafis-PLTSa-1.jpg","contentUrl":"https:\/\/setkab.go.id\/wp-content\/uploads\/2019\/07\/Grafis-PLTSa-1.jpg","width":1080,"height":1080},{"@type":"BreadcrumbList","@id":"https:\/\/setkab.go.id\/en\/four-waste-based-power-plants-to-finish-construction-this-year\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/setkab.go.id\/en\/"},{"@type":"ListItem","position":2,"name":"Four Waste-Based Power Plants to Finish Construction This Year"}]},{"@type":"WebSite","@id":"https:\/\/setkab.go.id\/#website","url":"https:\/\/setkab.go.id\/","name":"Sekretariat Kabinet Republik Indonesia","description":"Kabinet Merah Putih","publisher":{"@id":"https:\/\/setkab.go.id\/#organization"},"alternateName":"Setkab","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/setkab.go.id\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ENH"},{"@type":"Organization","@id":"https:\/\/setkab.go.id\/#organization","name":"Sekretariat Kabinet","alternateName":"Setkab","url":"https:\/\/setkab.go.id\/","logo":{"@type":"ImageObject","inLanguage":"ENH","@id":"https:\/\/setkab.go.id\/#\/schema\/logo\/image\/","url":"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/05\/garuda.png","contentUrl":"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/05\/garuda.png","width":720,"height":788,"caption":"Sekretariat Kabinet"},"image":{"@id":"https:\/\/setkab.go.id\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/id-id.facebook.com\/Setkabgoid","https:\/\/x.com\/setkabgoid","https:\/\/www.instagram.com\/sekretariat.kabinet\/","https:\/\/www.youtube.com\/channel\/UCey1BgbIUz6eVz2vywc2d7g","https:\/\/id.wikipedia.org\/wiki\/Sekretariat_Kabinet_Republik_Indonesia","https:\/\/www.tiktok.com\/@setkabgoid"]},{"@type":"Person","@id":"https:\/\/setkab.go.id\/#\/schema\/person\/ccc9c04099be79c6aa9ed45cb3bf345e","name":"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation","image":{"@type":"ImageObject","inLanguage":"ENH","@id":"https:\/\/setkab.go.id\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/8238a2781f78eec52de6cbadf268cdcab6067d59123790258ac87c2b257c0b3f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/8238a2781f78eec52de6cbadf268cdcab6067d59123790258ac87c2b257c0b3f?s=96&d=mm&r=g","caption":"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation"},"sameAs":["http:\/\/www.setkab.go.id"],"url":"https:\/\/setkab.go.id\/en\/author\/naster\/"}]}},"_links":{"self":[{"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/posts\/163668","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/users\/43"}],"replies":[{"embeddable":true,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/comments?post=163668"}],"version-history":[{"count":1,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/posts\/163668\/revisions"}],"predecessor-version":[{"id":163671,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/posts\/163668\/revisions\/163671"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/media\/163669"}],"wp:attachment":[{"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/media?parent=163668"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/categories?post=163668"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/tags?post=163668"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}