{"id":176882,"date":"2019-12-08T15:16:43","date_gmt":"2019-12-08T08:16:43","guid":{"rendered":"https:\/\/setkab.go.id\/?p=176882"},"modified":"2019-12-10T11:20:25","modified_gmt":"2019-12-10T04:20:25","slug":"jakarta-cikampek-ii-elevated-toll-road-to-start-operation-next-week","status":"publish","type":"post","link":"https:\/\/setkab.go.id\/en\/jakarta-cikampek-ii-elevated-toll-road-to-start-operation-next-week\/","title":{"rendered":"Jakarta-Cikampek II Elevated Toll Road to Start Operation Next Week"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-176883\" src=\"https:\/\/setkab.go.id\/wp-content\/uploads\/2019\/12\/8dec.jpeg\" alt=\"\" width=\"600\" height=\"340\" \/>Jakarta-Cikampek II\u00a0Elevated\u00a0Toll Road\u00a0is scheduled to start operating on 20 December this year, Minister of Transportation Budi Karya Sumadi has announced.<\/p>\n<p>The operation of the toll road was initially set on 15 December but it was delayed until 20 December due to several unfinished construction works.<!--more--><\/p>\n<p>\u201cWe have to finish some works, including repairing uneven concrete surfaces for the comfort of road users. 20 of December will also see traffic peak period of this year\u2019s Christmas and New Year\u2019s holidays,\u201d Budi said after inspecting Jakarta-Cikampek II\u00a0Elevated\u00a0Toll Road, Sunday (8\/12).<\/p>\n<p>The Minister added that by far the toll road only serves for Class I vehicles (non-bus) and it will be free of charge.<\/p>\n<p>The maximum speed limits on Jakarta-Cikampek II Elevated Toll Road is 60\u201380 km\/h and the speed monitoring will be supported with Electronic Traffic Law Enforcement system, he added.<\/p>\n<p>\u201cWe have installed CCTV cameras in several spots. Motorists who exceed speed limit will be imposed with sanction at the exit toll gate. We also will assign police officers every 4 km,\u201d he said, adding that elevated toll road will be on commercial operation in January or February 2020 after coordination with Minister of Public Works and Public Housing.<\/p>\n<p>The new toll road spanning 39 km is expected to ease traffic congestion in roads connecting capital Jakarta and the neighboring West Java town of Cikampek. <strong>(Ministry of Transportation PR\/ES)<\/strong><\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>Translated by : Rany Anjany Subachrum<br \/>\nReviewed by : M. Ersan Pamungkas<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Jakarta-Cikampek II\u00a0Elevated\u00a0Toll Road\u00a0is scheduled to start operating on 20 December this year, Minister of Transportation Budi Karya Sumadi has announced. The operation of the toll road was initially set on 15 December but it was delayed until 20 December due to several unfinished construction works.<\/p>\n","protected":false},"author":43,"featured_media":176883,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[77,66],"tags":[],"class_list":["post-176882","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-uncategorized-en"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v24.1 (Yoast SEO v26.1.1) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Jakarta-Cikampek II Elevated Toll Road to Start Operation Next Week - Sekretariat Kabinet Republik Indonesia<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/setkab.go.id\/en\/jakarta-cikampek-ii-elevated-toll-road-to-start-operation-next-week\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Jakarta-Cikampek II Elevated Toll Road to Start Operation Next Week - Sekretariat Kabinet Republik Indonesia\" \/>\n<meta property=\"og:description\" content=\"Jakarta-Cikampek II\u00a0Elevated\u00a0Toll Road\u00a0is scheduled to start operating on 20 December this year, Minister of Transportation Budi Karya Sumadi has announced. The operation of the toll road was initially set on 15 December but it was delayed until 20 December due to several unfinished construction works.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/setkab.go.id\/en\/jakarta-cikampek-ii-elevated-toll-road-to-start-operation-next-week\/\" \/>\n<meta property=\"og:site_name\" content=\"Sekretariat Kabinet Republik Indonesia\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/id-id.facebook.com\/Setkabgoid\" \/>\n<meta property=\"article:published_time\" content=\"2019-12-08T08:16:43+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2019-12-10T04:20:25+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/setkab.go.id\/wp-content\/uploads\/2019\/12\/8dec.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"600\" \/>\n\t<meta property=\"og:image:height\" content=\"340\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@setkabgoid\" \/>\n<meta name=\"twitter:site\" content=\"@setkabgoid\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"NewsArticle\",\"@id\":\"https:\/\/setkab.go.id\/en\/jakarta-cikampek-ii-elevated-toll-road-to-start-operation-next-week\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/setkab.go.id\/en\/jakarta-cikampek-ii-elevated-toll-road-to-start-operation-next-week\/\"},\"author\":{\"name\":\"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation\",\"@id\":\"https:\/\/setkab.go.id\/#\/schema\/person\/ccc9c04099be79c6aa9ed45cb3bf345e\"},\"headline\":\"Jakarta-Cikampek II Elevated Toll Road to Start Operation Next Week\",\"datePublished\":\"2019-12-08T08:16:43+00:00\",\"dateModified\":\"2019-12-10T04:20:25+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/setkab.go.id\/en\/jakarta-cikampek-ii-elevated-toll-road-to-start-operation-next-week\/\"},\"wordCount\":250,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/setkab.go.id\/#organization\"},\"image\":{\"@id\":\"https:\/\/setkab.go.id\/en\/jakarta-cikampek-ii-elevated-toll-road-to-start-operation-next-week\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/setkab.go.id\/wp-content\/uploads\/2019\/12\/8dec.jpeg\",\"articleSection\":[\"News\",\"Uncategorized @en\"],\"inLanguage\":\"ENH\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/setkab.go.id\/en\/jakarta-cikampek-ii-elevated-toll-road-to-start-operation-next-week\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/setkab.go.id\/en\/jakarta-cikampek-ii-elevated-toll-road-to-start-operation-next-week\/\",\"url\":\"https:\/\/setkab.go.id\/en\/jakarta-cikampek-ii-elevated-toll-road-to-start-operation-next-week\/\",\"name\":\"Jakarta-Cikampek II Elevated Toll Road to Start Operation Next Week - Sekretariat Kabinet Republik Indonesia\",\"isPartOf\":{\"@id\":\"https:\/\/setkab.go.id\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/setkab.go.id\/en\/jakarta-cikampek-ii-elevated-toll-road-to-start-operation-next-week\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/setkab.go.id\/en\/jakarta-cikampek-ii-elevated-toll-road-to-start-operation-next-week\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/setkab.go.id\/wp-content\/uploads\/2019\/12\/8dec.jpeg\",\"datePublished\":\"2019-12-08T08:16:43+00:00\",\"dateModified\":\"2019-12-10T04:20:25+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/setkab.go.id\/en\/jakarta-cikampek-ii-elevated-toll-road-to-start-operation-next-week\/#breadcrumb\"},\"inLanguage\":\"ENH\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/setkab.go.id\/en\/jakarta-cikampek-ii-elevated-toll-road-to-start-operation-next-week\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ENH\",\"@id\":\"https:\/\/setkab.go.id\/en\/jakarta-cikampek-ii-elevated-toll-road-to-start-operation-next-week\/#primaryimage\",\"url\":\"https:\/\/setkab.go.id\/wp-content\/uploads\/2019\/12\/8dec.jpeg\",\"contentUrl\":\"https:\/\/setkab.go.id\/wp-content\/uploads\/2019\/12\/8dec.jpeg\",\"width\":600,\"height\":340},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/setkab.go.id\/en\/jakarta-cikampek-ii-elevated-toll-road-to-start-operation-next-week\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/setkab.go.id\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Jakarta-Cikampek II Elevated Toll Road to Start Operation Next Week\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/setkab.go.id\/#website\",\"url\":\"https:\/\/setkab.go.id\/\",\"name\":\"Sekretariat Kabinet Republik Indonesia\",\"description\":\"Kabinet Merah Putih\",\"publisher\":{\"@id\":\"https:\/\/setkab.go.id\/#organization\"},\"alternateName\":\"Setkab\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/setkab.go.id\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ENH\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/setkab.go.id\/#organization\",\"name\":\"Sekretariat Kabinet\",\"alternateName\":\"Setkab\",\"url\":\"https:\/\/setkab.go.id\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ENH\",\"@id\":\"https:\/\/setkab.go.id\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/05\/garuda.png\",\"contentUrl\":\"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/05\/garuda.png\",\"width\":720,\"height\":788,\"caption\":\"Sekretariat Kabinet\"},\"image\":{\"@id\":\"https:\/\/setkab.go.id\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/id-id.facebook.com\/Setkabgoid\",\"https:\/\/x.com\/setkabgoid\",\"https:\/\/www.instagram.com\/sekretariat.kabinet\/\",\"https:\/\/www.youtube.com\/channel\/UCey1BgbIUz6eVz2vywc2d7g\",\"https:\/\/id.wikipedia.org\/wiki\/Sekretariat_Kabinet_Republik_Indonesia\",\"https:\/\/www.tiktok.com\/@setkabgoid\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/setkab.go.id\/#\/schema\/person\/ccc9c04099be79c6aa9ed45cb3bf345e\",\"name\":\"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ENH\",\"@id\":\"https:\/\/setkab.go.id\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/8238a2781f78eec52de6cbadf268cdcab6067d59123790258ac87c2b257c0b3f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/8238a2781f78eec52de6cbadf268cdcab6067d59123790258ac87c2b257c0b3f?s=96&d=mm&r=g\",\"caption\":\"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation\"},\"sameAs\":[\"http:\/\/www.setkab.go.id\"],\"url\":\"https:\/\/setkab.go.id\/en\/author\/naster\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Jakarta-Cikampek II Elevated Toll Road to Start Operation Next Week - Sekretariat Kabinet Republik Indonesia","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/setkab.go.id\/en\/jakarta-cikampek-ii-elevated-toll-road-to-start-operation-next-week\/","og_locale":"en_US","og_type":"article","og_title":"Jakarta-Cikampek II Elevated Toll Road to Start Operation Next Week - Sekretariat Kabinet Republik Indonesia","og_description":"Jakarta-Cikampek II\u00a0Elevated\u00a0Toll Road\u00a0is scheduled to start operating on 20 December this year, Minister of Transportation Budi Karya Sumadi has announced. The operation of the toll road was initially set on 15 December but it was delayed until 20 December due to several unfinished construction works.","og_url":"https:\/\/setkab.go.id\/en\/jakarta-cikampek-ii-elevated-toll-road-to-start-operation-next-week\/","og_site_name":"Sekretariat Kabinet Republik Indonesia","article_publisher":"https:\/\/id-id.facebook.com\/Setkabgoid","article_published_time":"2019-12-08T08:16:43+00:00","article_modified_time":"2019-12-10T04:20:25+00:00","og_image":[{"width":600,"height":340,"url":"https:\/\/setkab.go.id\/wp-content\/uploads\/2019\/12\/8dec.jpeg","type":"image\/jpeg"}],"author":"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation","twitter_card":"summary_large_image","twitter_creator":"@setkabgoid","twitter_site":"@setkabgoid","twitter_misc":{"Written by":"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"NewsArticle","@id":"https:\/\/setkab.go.id\/en\/jakarta-cikampek-ii-elevated-toll-road-to-start-operation-next-week\/#article","isPartOf":{"@id":"https:\/\/setkab.go.id\/en\/jakarta-cikampek-ii-elevated-toll-road-to-start-operation-next-week\/"},"author":{"name":"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation","@id":"https:\/\/setkab.go.id\/#\/schema\/person\/ccc9c04099be79c6aa9ed45cb3bf345e"},"headline":"Jakarta-Cikampek II Elevated Toll Road to Start Operation Next Week","datePublished":"2019-12-08T08:16:43+00:00","dateModified":"2019-12-10T04:20:25+00:00","mainEntityOfPage":{"@id":"https:\/\/setkab.go.id\/en\/jakarta-cikampek-ii-elevated-toll-road-to-start-operation-next-week\/"},"wordCount":250,"commentCount":0,"publisher":{"@id":"https:\/\/setkab.go.id\/#organization"},"image":{"@id":"https:\/\/setkab.go.id\/en\/jakarta-cikampek-ii-elevated-toll-road-to-start-operation-next-week\/#primaryimage"},"thumbnailUrl":"https:\/\/setkab.go.id\/wp-content\/uploads\/2019\/12\/8dec.jpeg","articleSection":["News","Uncategorized @en"],"inLanguage":"ENH","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/setkab.go.id\/en\/jakarta-cikampek-ii-elevated-toll-road-to-start-operation-next-week\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/setkab.go.id\/en\/jakarta-cikampek-ii-elevated-toll-road-to-start-operation-next-week\/","url":"https:\/\/setkab.go.id\/en\/jakarta-cikampek-ii-elevated-toll-road-to-start-operation-next-week\/","name":"Jakarta-Cikampek II Elevated Toll Road to Start Operation Next Week - Sekretariat Kabinet Republik Indonesia","isPartOf":{"@id":"https:\/\/setkab.go.id\/#website"},"primaryImageOfPage":{"@id":"https:\/\/setkab.go.id\/en\/jakarta-cikampek-ii-elevated-toll-road-to-start-operation-next-week\/#primaryimage"},"image":{"@id":"https:\/\/setkab.go.id\/en\/jakarta-cikampek-ii-elevated-toll-road-to-start-operation-next-week\/#primaryimage"},"thumbnailUrl":"https:\/\/setkab.go.id\/wp-content\/uploads\/2019\/12\/8dec.jpeg","datePublished":"2019-12-08T08:16:43+00:00","dateModified":"2019-12-10T04:20:25+00:00","breadcrumb":{"@id":"https:\/\/setkab.go.id\/en\/jakarta-cikampek-ii-elevated-toll-road-to-start-operation-next-week\/#breadcrumb"},"inLanguage":"ENH","potentialAction":[{"@type":"ReadAction","target":["https:\/\/setkab.go.id\/en\/jakarta-cikampek-ii-elevated-toll-road-to-start-operation-next-week\/"]}]},{"@type":"ImageObject","inLanguage":"ENH","@id":"https:\/\/setkab.go.id\/en\/jakarta-cikampek-ii-elevated-toll-road-to-start-operation-next-week\/#primaryimage","url":"https:\/\/setkab.go.id\/wp-content\/uploads\/2019\/12\/8dec.jpeg","contentUrl":"https:\/\/setkab.go.id\/wp-content\/uploads\/2019\/12\/8dec.jpeg","width":600,"height":340},{"@type":"BreadcrumbList","@id":"https:\/\/setkab.go.id\/en\/jakarta-cikampek-ii-elevated-toll-road-to-start-operation-next-week\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/setkab.go.id\/en\/"},{"@type":"ListItem","position":2,"name":"Jakarta-Cikampek II Elevated Toll Road to Start Operation Next Week"}]},{"@type":"WebSite","@id":"https:\/\/setkab.go.id\/#website","url":"https:\/\/setkab.go.id\/","name":"Sekretariat Kabinet Republik Indonesia","description":"Kabinet Merah Putih","publisher":{"@id":"https:\/\/setkab.go.id\/#organization"},"alternateName":"Setkab","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/setkab.go.id\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ENH"},{"@type":"Organization","@id":"https:\/\/setkab.go.id\/#organization","name":"Sekretariat Kabinet","alternateName":"Setkab","url":"https:\/\/setkab.go.id\/","logo":{"@type":"ImageObject","inLanguage":"ENH","@id":"https:\/\/setkab.go.id\/#\/schema\/logo\/image\/","url":"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/05\/garuda.png","contentUrl":"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/05\/garuda.png","width":720,"height":788,"caption":"Sekretariat Kabinet"},"image":{"@id":"https:\/\/setkab.go.id\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/id-id.facebook.com\/Setkabgoid","https:\/\/x.com\/setkabgoid","https:\/\/www.instagram.com\/sekretariat.kabinet\/","https:\/\/www.youtube.com\/channel\/UCey1BgbIUz6eVz2vywc2d7g","https:\/\/id.wikipedia.org\/wiki\/Sekretariat_Kabinet_Republik_Indonesia","https:\/\/www.tiktok.com\/@setkabgoid"]},{"@type":"Person","@id":"https:\/\/setkab.go.id\/#\/schema\/person\/ccc9c04099be79c6aa9ed45cb3bf345e","name":"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation","image":{"@type":"ImageObject","inLanguage":"ENH","@id":"https:\/\/setkab.go.id\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/8238a2781f78eec52de6cbadf268cdcab6067d59123790258ac87c2b257c0b3f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/8238a2781f78eec52de6cbadf268cdcab6067d59123790258ac87c2b257c0b3f?s=96&d=mm&r=g","caption":"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation"},"sameAs":["http:\/\/www.setkab.go.id"],"url":"https:\/\/setkab.go.id\/en\/author\/naster\/"}]}},"_links":{"self":[{"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/posts\/176882","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/users\/43"}],"replies":[{"embeddable":true,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/comments?post=176882"}],"version-history":[{"count":1,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/posts\/176882\/revisions"}],"predecessor-version":[{"id":176884,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/posts\/176882\/revisions\/176884"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/media\/176883"}],"wp:attachment":[{"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/media?parent=176882"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/categories?post=176882"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/tags?post=176882"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}