{"id":177599,"date":"2019-12-17T13:23:51","date_gmt":"2019-12-17T06:23:51","guid":{"rendered":"https:\/\/setkab.go.id\/?p=177599"},"modified":"2019-12-18T10:26:11","modified_gmt":"2019-12-18T03:26:11","slug":"indonesias-largest-pltu-begins-commercial-operation","status":"publish","type":"post","link":"https:\/\/setkab.go.id\/en\/indonesias-largest-pltu-begins-commercial-operation\/","title":{"rendered":"Indonesia\u2019s Largest PLTU Begins Commercial Operation"},"content":{"rendered":"<div id=\"attachment_177606\" style=\"width: 740px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-177606\" class=\"size-full wp-image-177606\" src=\"https:\/\/setkab.go.id\/wp-content\/uploads\/2019\/12\/PLTU-Jawa-7-1.jpg\" alt=\"\" width=\"730\" height=\"487\" \/><p id=\"caption-attachment-177606\" class=\"wp-caption-text\">the Steam-fueled Power Plant (PLTU) of Java 7 Unit 1.<\/p><\/div>\n<p>In a bid to accelerate the 35,000 MW program, the Indonesian Government last week inaugurated the commercial operation of Unit 1 of Java 1 Steam-fueled Power Plant (PLTU) .<\/p>\n<p>The coal-based PLTU t located in Serang City, Banten provincial capital, is claimed to be the largest power plant in Indonesia with a total capacity of 2 x 1,000 MW.<!--more--><\/p>\n<p>Head of Communication and Public Information and Cooperation Agency of Ministry of Energy and Mineral Resources Agung Pribadi said that the PLTU is the first in Indonesia that adopts Ultra Super Critical (USC) boiler technology.<\/p>\n<p>\u201cThe USC technology is projected to be able to increase generator efficiency 15 percent higher than non-USC, thereby reducing coal costs per kWh. It is also a way to reduce greenhouse gas emission,\u201d Agung said on Monday (16\/12).<\/p>\n<p>Furthermore, the PLTU is also run on Sea Water Fuel Gas Desulfurization technology. The system is considered environmentally friendly since the distribution of coal from the barge uses a coal handling plant that spans along four kilometers to avoid a coal spill, Agung said.<\/p>\n<p>For the record, the PLTU uses low rank coal as fuel which has heating value of 4000 to 4600 kCal\/kg and requires coal supply of 7 million tons per year.<\/p>\n<p>The power plant will functionto strengthen Java-Bali interconnection system through Suralaya-Balaraja 500 kV.<\/p>\n<p>\u201cThe PLTU could ease the peak burden of the Java-Bali system which continues to increase from year to year,\u201d Agung said, adding that the Government hass also set a target to operate two power plants with the same capacity next year. <strong>(BLIK Kementerian ESDM\/ES)<\/strong><\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>Translated by: Galuh Wicaksono<br \/>\nReviewed by: Muhammad Ersan Pamungkas<\/p>\n","protected":false},"excerpt":{"rendered":"<p>In a bid to accelerate the 35,000 MW program, the Indonesian Government last week inaugurated the commercial operation of Unit 1 of Java 1 Steam-fueled Power Plant (PLTU) . The coal-based PLTU t located in Serang City, Banten provincial capital, is claimed to be the largest power plant in Indonesia with a total capacity of [&hellip;]<\/p>\n","protected":false},"author":43,"featured_media":177606,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[77],"tags":[],"class_list":["post-177599","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v24.1 (Yoast SEO v26.1.1) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Indonesia\u2019s Largest PLTU Begins Commercial Operation - Sekretariat Kabinet Republik Indonesia<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/setkab.go.id\/en\/indonesias-largest-pltu-begins-commercial-operation\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Indonesia\u2019s Largest PLTU Begins Commercial Operation - Sekretariat Kabinet Republik Indonesia\" \/>\n<meta property=\"og:description\" content=\"In a bid to accelerate the 35,000 MW program, the Indonesian Government last week inaugurated the commercial operation of Unit 1 of Java 1 Steam-fueled Power Plant (PLTU) . The coal-based PLTU t located in Serang City, Banten provincial capital, is claimed to be the largest power plant in Indonesia with a total capacity of [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/setkab.go.id\/en\/indonesias-largest-pltu-begins-commercial-operation\/\" \/>\n<meta property=\"og:site_name\" content=\"Sekretariat Kabinet Republik Indonesia\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/id-id.facebook.com\/Setkabgoid\" \/>\n<meta property=\"article:published_time\" content=\"2019-12-17T06:23:51+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2019-12-18T03:26:11+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/setkab.go.id\/wp-content\/uploads\/2019\/12\/PLTU-Jawa-7-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"730\" \/>\n\t<meta property=\"og:image:height\" content=\"487\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@setkabgoid\" \/>\n<meta name=\"twitter:site\" content=\"@setkabgoid\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"NewsArticle\",\"@id\":\"https:\/\/setkab.go.id\/en\/indonesias-largest-pltu-begins-commercial-operation\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/setkab.go.id\/en\/indonesias-largest-pltu-begins-commercial-operation\/\"},\"author\":{\"name\":\"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation\",\"@id\":\"https:\/\/setkab.go.id\/#\/schema\/person\/ccc9c04099be79c6aa9ed45cb3bf345e\"},\"headline\":\"Indonesia\u2019s Largest PLTU Begins Commercial Operation\",\"datePublished\":\"2019-12-17T06:23:51+00:00\",\"dateModified\":\"2019-12-18T03:26:11+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/setkab.go.id\/en\/indonesias-largest-pltu-begins-commercial-operation\/\"},\"wordCount\":286,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/setkab.go.id\/#organization\"},\"image\":{\"@id\":\"https:\/\/setkab.go.id\/en\/indonesias-largest-pltu-begins-commercial-operation\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/setkab.go.id\/wp-content\/uploads\/2019\/12\/PLTU-Jawa-7-1.jpg\",\"articleSection\":[\"News\"],\"inLanguage\":\"ENH\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/setkab.go.id\/en\/indonesias-largest-pltu-begins-commercial-operation\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/setkab.go.id\/en\/indonesias-largest-pltu-begins-commercial-operation\/\",\"url\":\"https:\/\/setkab.go.id\/en\/indonesias-largest-pltu-begins-commercial-operation\/\",\"name\":\"Indonesia\u2019s Largest PLTU Begins Commercial Operation - Sekretariat Kabinet Republik Indonesia\",\"isPartOf\":{\"@id\":\"https:\/\/setkab.go.id\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/setkab.go.id\/en\/indonesias-largest-pltu-begins-commercial-operation\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/setkab.go.id\/en\/indonesias-largest-pltu-begins-commercial-operation\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/setkab.go.id\/wp-content\/uploads\/2019\/12\/PLTU-Jawa-7-1.jpg\",\"datePublished\":\"2019-12-17T06:23:51+00:00\",\"dateModified\":\"2019-12-18T03:26:11+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/setkab.go.id\/en\/indonesias-largest-pltu-begins-commercial-operation\/#breadcrumb\"},\"inLanguage\":\"ENH\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/setkab.go.id\/en\/indonesias-largest-pltu-begins-commercial-operation\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ENH\",\"@id\":\"https:\/\/setkab.go.id\/en\/indonesias-largest-pltu-begins-commercial-operation\/#primaryimage\",\"url\":\"https:\/\/setkab.go.id\/wp-content\/uploads\/2019\/12\/PLTU-Jawa-7-1.jpg\",\"contentUrl\":\"https:\/\/setkab.go.id\/wp-content\/uploads\/2019\/12\/PLTU-Jawa-7-1.jpg\",\"width\":730,\"height\":487,\"caption\":\"the Steam-fueled Power Plant (PLTU) of Java 7 Unit 1.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/setkab.go.id\/en\/indonesias-largest-pltu-begins-commercial-operation\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/setkab.go.id\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Indonesia\u2019s Largest PLTU Begins Commercial Operation\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/setkab.go.id\/#website\",\"url\":\"https:\/\/setkab.go.id\/\",\"name\":\"Sekretariat Kabinet Republik Indonesia\",\"description\":\"Kabinet Merah Putih\",\"publisher\":{\"@id\":\"https:\/\/setkab.go.id\/#organization\"},\"alternateName\":\"Setkab\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/setkab.go.id\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ENH\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/setkab.go.id\/#organization\",\"name\":\"Sekretariat Kabinet\",\"alternateName\":\"Setkab\",\"url\":\"https:\/\/setkab.go.id\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ENH\",\"@id\":\"https:\/\/setkab.go.id\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/05\/garuda.png\",\"contentUrl\":\"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/05\/garuda.png\",\"width\":720,\"height\":788,\"caption\":\"Sekretariat Kabinet\"},\"image\":{\"@id\":\"https:\/\/setkab.go.id\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/id-id.facebook.com\/Setkabgoid\",\"https:\/\/x.com\/setkabgoid\",\"https:\/\/www.instagram.com\/sekretariat.kabinet\/\",\"https:\/\/www.youtube.com\/channel\/UCey1BgbIUz6eVz2vywc2d7g\",\"https:\/\/id.wikipedia.org\/wiki\/Sekretariat_Kabinet_Republik_Indonesia\",\"https:\/\/www.tiktok.com\/@setkabgoid\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/setkab.go.id\/#\/schema\/person\/ccc9c04099be79c6aa9ed45cb3bf345e\",\"name\":\"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ENH\",\"@id\":\"https:\/\/setkab.go.id\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/8238a2781f78eec52de6cbadf268cdcab6067d59123790258ac87c2b257c0b3f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/8238a2781f78eec52de6cbadf268cdcab6067d59123790258ac87c2b257c0b3f?s=96&d=mm&r=g\",\"caption\":\"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation\"},\"sameAs\":[\"http:\/\/www.setkab.go.id\"],\"url\":\"https:\/\/setkab.go.id\/en\/author\/naster\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Indonesia\u2019s Largest PLTU Begins Commercial Operation - Sekretariat Kabinet Republik Indonesia","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/setkab.go.id\/en\/indonesias-largest-pltu-begins-commercial-operation\/","og_locale":"en_US","og_type":"article","og_title":"Indonesia\u2019s Largest PLTU Begins Commercial Operation - Sekretariat Kabinet Republik Indonesia","og_description":"In a bid to accelerate the 35,000 MW program, the Indonesian Government last week inaugurated the commercial operation of Unit 1 of Java 1 Steam-fueled Power Plant (PLTU) . The coal-based PLTU t located in Serang City, Banten provincial capital, is claimed to be the largest power plant in Indonesia with a total capacity of [&hellip;]","og_url":"https:\/\/setkab.go.id\/en\/indonesias-largest-pltu-begins-commercial-operation\/","og_site_name":"Sekretariat Kabinet Republik Indonesia","article_publisher":"https:\/\/id-id.facebook.com\/Setkabgoid","article_published_time":"2019-12-17T06:23:51+00:00","article_modified_time":"2019-12-18T03:26:11+00:00","og_image":[{"width":730,"height":487,"url":"https:\/\/setkab.go.id\/wp-content\/uploads\/2019\/12\/PLTU-Jawa-7-1.jpg","type":"image\/jpeg"}],"author":"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation","twitter_card":"summary_large_image","twitter_creator":"@setkabgoid","twitter_site":"@setkabgoid","twitter_misc":{"Written by":"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"NewsArticle","@id":"https:\/\/setkab.go.id\/en\/indonesias-largest-pltu-begins-commercial-operation\/#article","isPartOf":{"@id":"https:\/\/setkab.go.id\/en\/indonesias-largest-pltu-begins-commercial-operation\/"},"author":{"name":"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation","@id":"https:\/\/setkab.go.id\/#\/schema\/person\/ccc9c04099be79c6aa9ed45cb3bf345e"},"headline":"Indonesia\u2019s Largest PLTU Begins Commercial Operation","datePublished":"2019-12-17T06:23:51+00:00","dateModified":"2019-12-18T03:26:11+00:00","mainEntityOfPage":{"@id":"https:\/\/setkab.go.id\/en\/indonesias-largest-pltu-begins-commercial-operation\/"},"wordCount":286,"commentCount":0,"publisher":{"@id":"https:\/\/setkab.go.id\/#organization"},"image":{"@id":"https:\/\/setkab.go.id\/en\/indonesias-largest-pltu-begins-commercial-operation\/#primaryimage"},"thumbnailUrl":"https:\/\/setkab.go.id\/wp-content\/uploads\/2019\/12\/PLTU-Jawa-7-1.jpg","articleSection":["News"],"inLanguage":"ENH","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/setkab.go.id\/en\/indonesias-largest-pltu-begins-commercial-operation\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/setkab.go.id\/en\/indonesias-largest-pltu-begins-commercial-operation\/","url":"https:\/\/setkab.go.id\/en\/indonesias-largest-pltu-begins-commercial-operation\/","name":"Indonesia\u2019s Largest PLTU Begins Commercial Operation - Sekretariat Kabinet Republik Indonesia","isPartOf":{"@id":"https:\/\/setkab.go.id\/#website"},"primaryImageOfPage":{"@id":"https:\/\/setkab.go.id\/en\/indonesias-largest-pltu-begins-commercial-operation\/#primaryimage"},"image":{"@id":"https:\/\/setkab.go.id\/en\/indonesias-largest-pltu-begins-commercial-operation\/#primaryimage"},"thumbnailUrl":"https:\/\/setkab.go.id\/wp-content\/uploads\/2019\/12\/PLTU-Jawa-7-1.jpg","datePublished":"2019-12-17T06:23:51+00:00","dateModified":"2019-12-18T03:26:11+00:00","breadcrumb":{"@id":"https:\/\/setkab.go.id\/en\/indonesias-largest-pltu-begins-commercial-operation\/#breadcrumb"},"inLanguage":"ENH","potentialAction":[{"@type":"ReadAction","target":["https:\/\/setkab.go.id\/en\/indonesias-largest-pltu-begins-commercial-operation\/"]}]},{"@type":"ImageObject","inLanguage":"ENH","@id":"https:\/\/setkab.go.id\/en\/indonesias-largest-pltu-begins-commercial-operation\/#primaryimage","url":"https:\/\/setkab.go.id\/wp-content\/uploads\/2019\/12\/PLTU-Jawa-7-1.jpg","contentUrl":"https:\/\/setkab.go.id\/wp-content\/uploads\/2019\/12\/PLTU-Jawa-7-1.jpg","width":730,"height":487,"caption":"the Steam-fueled Power Plant (PLTU) of Java 7 Unit 1."},{"@type":"BreadcrumbList","@id":"https:\/\/setkab.go.id\/en\/indonesias-largest-pltu-begins-commercial-operation\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/setkab.go.id\/en\/"},{"@type":"ListItem","position":2,"name":"Indonesia\u2019s Largest PLTU Begins Commercial Operation"}]},{"@type":"WebSite","@id":"https:\/\/setkab.go.id\/#website","url":"https:\/\/setkab.go.id\/","name":"Sekretariat Kabinet Republik Indonesia","description":"Kabinet Merah Putih","publisher":{"@id":"https:\/\/setkab.go.id\/#organization"},"alternateName":"Setkab","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/setkab.go.id\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ENH"},{"@type":"Organization","@id":"https:\/\/setkab.go.id\/#organization","name":"Sekretariat Kabinet","alternateName":"Setkab","url":"https:\/\/setkab.go.id\/","logo":{"@type":"ImageObject","inLanguage":"ENH","@id":"https:\/\/setkab.go.id\/#\/schema\/logo\/image\/","url":"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/05\/garuda.png","contentUrl":"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/05\/garuda.png","width":720,"height":788,"caption":"Sekretariat Kabinet"},"image":{"@id":"https:\/\/setkab.go.id\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/id-id.facebook.com\/Setkabgoid","https:\/\/x.com\/setkabgoid","https:\/\/www.instagram.com\/sekretariat.kabinet\/","https:\/\/www.youtube.com\/channel\/UCey1BgbIUz6eVz2vywc2d7g","https:\/\/id.wikipedia.org\/wiki\/Sekretariat_Kabinet_Republik_Indonesia","https:\/\/www.tiktok.com\/@setkabgoid"]},{"@type":"Person","@id":"https:\/\/setkab.go.id\/#\/schema\/person\/ccc9c04099be79c6aa9ed45cb3bf345e","name":"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation","image":{"@type":"ImageObject","inLanguage":"ENH","@id":"https:\/\/setkab.go.id\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/8238a2781f78eec52de6cbadf268cdcab6067d59123790258ac87c2b257c0b3f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/8238a2781f78eec52de6cbadf268cdcab6067d59123790258ac87c2b257c0b3f?s=96&d=mm&r=g","caption":"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation"},"sameAs":["http:\/\/www.setkab.go.id"],"url":"https:\/\/setkab.go.id\/en\/author\/naster\/"}]}},"_links":{"self":[{"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/posts\/177599","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/users\/43"}],"replies":[{"embeddable":true,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/comments?post=177599"}],"version-history":[{"count":1,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/posts\/177599\/revisions"}],"predecessor-version":[{"id":177612,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/posts\/177599\/revisions\/177612"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/media\/177606"}],"wp:attachment":[{"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/media?parent=177599"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/categories?post=177599"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/tags?post=177599"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}