{"id":183690,"date":"2020-02-23T13:59:47","date_gmt":"2020-02-23T06:59:47","guid":{"rendered":"https:\/\/setkab.go.id\/?p=183690"},"modified":"2020-02-26T09:45:37","modified_gmt":"2020-02-26T02:45:37","slug":"jakarta-bandung-high-speed-railway-project-to-be-completed-by-2021-transport-minister","status":"publish","type":"post","link":"https:\/\/setkab.go.id\/en\/jakarta-bandung-high-speed-railway-project-to-be-completed-by-2021-transport-minister\/","title":{"rendered":"Jakarta-Bandung High Speed Railway Project to be Completed by 2021: Transport Minister"},"content":{"rendered":"<div id=\"attachment_183735\" style=\"width: 610px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-183735\" class=\"size-full wp-image-183735\" src=\"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/02\/img-20200223-wa0018-1.jpg\" alt=\"\" width=\"600\" height=\"340\" srcset=\"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/02\/img-20200223-wa0018-1.jpg 600w, https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/02\/img-20200223-wa0018-1-300x170.jpg 300w, https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/02\/img-20200223-wa0018-1-360x204.jpg 360w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><p id=\"caption-attachment-183735\" class=\"wp-caption-text\">Transportation Minister in a group photo after reviewing two project work points in Purwakarta and Rancaekek, Bandung, Sunday (23\/2). (Photo by: Ministry of Transportation)<\/p><\/div>\n<p>Minister of Transportation Budi Karya Sumadi has expressed optimistism that the high-speed railway project connecting capital Jakarta with West Java&#8217;s provincial capital of Bandung can be completed by the end of next year.<\/p>\n<p>\u201cWe are focusing on completing this project and it will be operational by the end of 2021. I have talked with PT Kereta Cepat Indonesia-China (KCIC) team as the project implementer and we can make optimum efforts,\u201d Budi said after reviewing two project work points in Purwakarta and Rancaekek, Bandung, Sunday (23\/2).<\/p>\n<p>To date, Budi added, the progress of the Jakarta-Bandung high speed railway project has reached 44% and as for land acquisition alone, it has reached 99.96%.<\/p>\n<p>The Minister also said there is still a plot of land in the Bandung area that is in the consignment stage. \u201cThe construction must meet the set target and there must be a transfer of technology,\u201d he added.<\/p>\n<p>Regarding Covid-19 or the coronavirus outbreak that hit mainland China that might affect the project, Budi said he had coordinated with PT. KCIC and ensured that the Jakarta-Bandung high speed railway project will run as planned by empowering local workforce, which in turn will have an impact on improving the people\u2019s economy.<\/p>\n<p>\u201cI am proud and elated to have a high speed railway project for the first time in Indonesia. This is done under a financing scheme of business-to-business, which means Indonesian private sector with Chinese private sector. This is a strategic project that we want because it does not burden our State Budget. Imagine, Rp83 trillion investment enters Indonesia from private sector in this project,\u201d Budi said, adding that if this project is successful, it is not impossible that in the future it will continue to Surabaya.<\/p>\n<p>Meanwhile, President Director of PT KCIC Chandra Dwiputra ensured that his company has anticipated a number of land conditions that are vulnerable at several points in West Java province.<\/p>\n<p>In addition to land factors, according to Chandra, extreme weather lately has also been anticipated so that it is expected that it will not affect the construction process. \u201cWe have mitigated those vulnerable area. We have anticipated this\u201d Chandra said.<\/p>\n<p>For the record, PT KCIC is currently working on as many as 13 Tunnels or the Jakarta-Bandung high speed railway tunnel.<\/p>\n<p>The high speed railway is expected to have a length of 142.3 km with four stops, namely Halim Station, Karawang Station, Walini Station, and Tegalluar, Bandung, 80 km of which will be elevated roads.<\/p>\n<p>The rest of the Jakarta-Bandung high speed railway line is done on the land including tunnels that penetrate the hill.<\/p>\n<p>The Jakarta-Bandung high speed railway is expected to reduce travel time, which is around 46 minutes with a speed of around 350 km\/hour. (BKIP Kemenhub\/EN)<\/p>\n<p>Translated by: Muhardi<\/p>\n<p>Reviewed by: M. Ersan Pamungkas<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Minister of Transportation Budi Karya Sumadi has expressed optimistism that the high-speed railway project connecting capital Jakarta with West Java&#8217;s provincial capital of Bandung can be completed by the end of next year. \u201cWe are focusing on completing this project and it will be operational by the end of 2021. I have talked with PT [&hellip;]<\/p>\n","protected":false},"author":43,"featured_media":183735,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[77],"tags":[],"class_list":["post-183690","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v24.1 (Yoast SEO v26.1.1) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Jakarta-Bandung High Speed Railway Project to be Completed by 2021: Transport Minister - Sekretariat Kabinet Republik Indonesia<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/setkab.go.id\/en\/jakarta-bandung-high-speed-railway-project-to-be-completed-by-2021-transport-minister\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Jakarta-Bandung High Speed Railway Project to be Completed by 2021: Transport Minister - Sekretariat Kabinet Republik Indonesia\" \/>\n<meta property=\"og:description\" content=\"Minister of Transportation Budi Karya Sumadi has expressed optimistism that the high-speed railway project connecting capital Jakarta with West Java&#8217;s provincial capital of Bandung can be completed by the end of next year. \u201cWe are focusing on completing this project and it will be operational by the end of 2021. I have talked with PT [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/setkab.go.id\/en\/jakarta-bandung-high-speed-railway-project-to-be-completed-by-2021-transport-minister\/\" \/>\n<meta property=\"og:site_name\" content=\"Sekretariat Kabinet Republik Indonesia\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/id-id.facebook.com\/Setkabgoid\" \/>\n<meta property=\"article:published_time\" content=\"2020-02-23T06:59:47+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2020-02-26T02:45:37+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/02\/img-20200223-wa0018-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"600\" \/>\n\t<meta property=\"og:image:height\" content=\"340\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@setkabgoid\" \/>\n<meta name=\"twitter:site\" content=\"@setkabgoid\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"NewsArticle\",\"@id\":\"https:\/\/setkab.go.id\/en\/jakarta-bandung-high-speed-railway-project-to-be-completed-by-2021-transport-minister\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/setkab.go.id\/en\/jakarta-bandung-high-speed-railway-project-to-be-completed-by-2021-transport-minister\/\"},\"author\":{\"name\":\"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation\",\"@id\":\"https:\/\/setkab.go.id\/#\/schema\/person\/ccc9c04099be79c6aa9ed45cb3bf345e\"},\"headline\":\"Jakarta-Bandung High Speed Railway Project to be Completed by 2021: Transport Minister\",\"datePublished\":\"2020-02-23T06:59:47+00:00\",\"dateModified\":\"2020-02-26T02:45:37+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/setkab.go.id\/en\/jakarta-bandung-high-speed-railway-project-to-be-completed-by-2021-transport-minister\/\"},\"wordCount\":500,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/setkab.go.id\/#organization\"},\"image\":{\"@id\":\"https:\/\/setkab.go.id\/en\/jakarta-bandung-high-speed-railway-project-to-be-completed-by-2021-transport-minister\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/02\/img-20200223-wa0018-1.jpg\",\"articleSection\":[\"News\"],\"inLanguage\":\"ENH\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/setkab.go.id\/en\/jakarta-bandung-high-speed-railway-project-to-be-completed-by-2021-transport-minister\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/setkab.go.id\/en\/jakarta-bandung-high-speed-railway-project-to-be-completed-by-2021-transport-minister\/\",\"url\":\"https:\/\/setkab.go.id\/en\/jakarta-bandung-high-speed-railway-project-to-be-completed-by-2021-transport-minister\/\",\"name\":\"Jakarta-Bandung High Speed Railway Project to be Completed by 2021: Transport Minister - Sekretariat Kabinet Republik Indonesia\",\"isPartOf\":{\"@id\":\"https:\/\/setkab.go.id\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/setkab.go.id\/en\/jakarta-bandung-high-speed-railway-project-to-be-completed-by-2021-transport-minister\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/setkab.go.id\/en\/jakarta-bandung-high-speed-railway-project-to-be-completed-by-2021-transport-minister\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/02\/img-20200223-wa0018-1.jpg\",\"datePublished\":\"2020-02-23T06:59:47+00:00\",\"dateModified\":\"2020-02-26T02:45:37+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/setkab.go.id\/en\/jakarta-bandung-high-speed-railway-project-to-be-completed-by-2021-transport-minister\/#breadcrumb\"},\"inLanguage\":\"ENH\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/setkab.go.id\/en\/jakarta-bandung-high-speed-railway-project-to-be-completed-by-2021-transport-minister\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ENH\",\"@id\":\"https:\/\/setkab.go.id\/en\/jakarta-bandung-high-speed-railway-project-to-be-completed-by-2021-transport-minister\/#primaryimage\",\"url\":\"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/02\/img-20200223-wa0018-1.jpg\",\"contentUrl\":\"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/02\/img-20200223-wa0018-1.jpg\",\"width\":600,\"height\":340,\"caption\":\"Transportation Minister in a group photo after reviewing two project work points in Purwakarta and Rancaekek, Bandung, Sunday (23\/2). (Photo by: Ministry of Transportation)\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/setkab.go.id\/en\/jakarta-bandung-high-speed-railway-project-to-be-completed-by-2021-transport-minister\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/setkab.go.id\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Jakarta-Bandung High Speed Railway Project to be Completed by 2021: Transport Minister\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/setkab.go.id\/#website\",\"url\":\"https:\/\/setkab.go.id\/\",\"name\":\"Sekretariat Kabinet Republik Indonesia\",\"description\":\"Kabinet Merah Putih\",\"publisher\":{\"@id\":\"https:\/\/setkab.go.id\/#organization\"},\"alternateName\":\"Setkab\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/setkab.go.id\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ENH\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/setkab.go.id\/#organization\",\"name\":\"Sekretariat Kabinet\",\"alternateName\":\"Setkab\",\"url\":\"https:\/\/setkab.go.id\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ENH\",\"@id\":\"https:\/\/setkab.go.id\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/05\/garuda.png\",\"contentUrl\":\"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/05\/garuda.png\",\"width\":720,\"height\":788,\"caption\":\"Sekretariat Kabinet\"},\"image\":{\"@id\":\"https:\/\/setkab.go.id\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/id-id.facebook.com\/Setkabgoid\",\"https:\/\/x.com\/setkabgoid\",\"https:\/\/www.instagram.com\/sekretariat.kabinet\/\",\"https:\/\/www.youtube.com\/channel\/UCey1BgbIUz6eVz2vywc2d7g\",\"https:\/\/id.wikipedia.org\/wiki\/Sekretariat_Kabinet_Republik_Indonesia\",\"https:\/\/www.tiktok.com\/@setkabgoid\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/setkab.go.id\/#\/schema\/person\/ccc9c04099be79c6aa9ed45cb3bf345e\",\"name\":\"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ENH\",\"@id\":\"https:\/\/setkab.go.id\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/8238a2781f78eec52de6cbadf268cdcab6067d59123790258ac87c2b257c0b3f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/8238a2781f78eec52de6cbadf268cdcab6067d59123790258ac87c2b257c0b3f?s=96&d=mm&r=g\",\"caption\":\"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation\"},\"sameAs\":[\"http:\/\/www.setkab.go.id\"],\"url\":\"https:\/\/setkab.go.id\/en\/author\/naster\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Jakarta-Bandung High Speed Railway Project to be Completed by 2021: Transport Minister - Sekretariat Kabinet Republik Indonesia","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/setkab.go.id\/en\/jakarta-bandung-high-speed-railway-project-to-be-completed-by-2021-transport-minister\/","og_locale":"en_US","og_type":"article","og_title":"Jakarta-Bandung High Speed Railway Project to be Completed by 2021: Transport Minister - Sekretariat Kabinet Republik Indonesia","og_description":"Minister of Transportation Budi Karya Sumadi has expressed optimistism that the high-speed railway project connecting capital Jakarta with West Java&#8217;s provincial capital of Bandung can be completed by the end of next year. \u201cWe are focusing on completing this project and it will be operational by the end of 2021. I have talked with PT [&hellip;]","og_url":"https:\/\/setkab.go.id\/en\/jakarta-bandung-high-speed-railway-project-to-be-completed-by-2021-transport-minister\/","og_site_name":"Sekretariat Kabinet Republik Indonesia","article_publisher":"https:\/\/id-id.facebook.com\/Setkabgoid","article_published_time":"2020-02-23T06:59:47+00:00","article_modified_time":"2020-02-26T02:45:37+00:00","og_image":[{"width":600,"height":340,"url":"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/02\/img-20200223-wa0018-1.jpg","type":"image\/jpeg"}],"author":"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation","twitter_card":"summary_large_image","twitter_creator":"@setkabgoid","twitter_site":"@setkabgoid","twitter_misc":{"Written by":"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"NewsArticle","@id":"https:\/\/setkab.go.id\/en\/jakarta-bandung-high-speed-railway-project-to-be-completed-by-2021-transport-minister\/#article","isPartOf":{"@id":"https:\/\/setkab.go.id\/en\/jakarta-bandung-high-speed-railway-project-to-be-completed-by-2021-transport-minister\/"},"author":{"name":"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation","@id":"https:\/\/setkab.go.id\/#\/schema\/person\/ccc9c04099be79c6aa9ed45cb3bf345e"},"headline":"Jakarta-Bandung High Speed Railway Project to be Completed by 2021: Transport Minister","datePublished":"2020-02-23T06:59:47+00:00","dateModified":"2020-02-26T02:45:37+00:00","mainEntityOfPage":{"@id":"https:\/\/setkab.go.id\/en\/jakarta-bandung-high-speed-railway-project-to-be-completed-by-2021-transport-minister\/"},"wordCount":500,"commentCount":0,"publisher":{"@id":"https:\/\/setkab.go.id\/#organization"},"image":{"@id":"https:\/\/setkab.go.id\/en\/jakarta-bandung-high-speed-railway-project-to-be-completed-by-2021-transport-minister\/#primaryimage"},"thumbnailUrl":"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/02\/img-20200223-wa0018-1.jpg","articleSection":["News"],"inLanguage":"ENH","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/setkab.go.id\/en\/jakarta-bandung-high-speed-railway-project-to-be-completed-by-2021-transport-minister\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/setkab.go.id\/en\/jakarta-bandung-high-speed-railway-project-to-be-completed-by-2021-transport-minister\/","url":"https:\/\/setkab.go.id\/en\/jakarta-bandung-high-speed-railway-project-to-be-completed-by-2021-transport-minister\/","name":"Jakarta-Bandung High Speed Railway Project to be Completed by 2021: Transport Minister - Sekretariat Kabinet Republik Indonesia","isPartOf":{"@id":"https:\/\/setkab.go.id\/#website"},"primaryImageOfPage":{"@id":"https:\/\/setkab.go.id\/en\/jakarta-bandung-high-speed-railway-project-to-be-completed-by-2021-transport-minister\/#primaryimage"},"image":{"@id":"https:\/\/setkab.go.id\/en\/jakarta-bandung-high-speed-railway-project-to-be-completed-by-2021-transport-minister\/#primaryimage"},"thumbnailUrl":"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/02\/img-20200223-wa0018-1.jpg","datePublished":"2020-02-23T06:59:47+00:00","dateModified":"2020-02-26T02:45:37+00:00","breadcrumb":{"@id":"https:\/\/setkab.go.id\/en\/jakarta-bandung-high-speed-railway-project-to-be-completed-by-2021-transport-minister\/#breadcrumb"},"inLanguage":"ENH","potentialAction":[{"@type":"ReadAction","target":["https:\/\/setkab.go.id\/en\/jakarta-bandung-high-speed-railway-project-to-be-completed-by-2021-transport-minister\/"]}]},{"@type":"ImageObject","inLanguage":"ENH","@id":"https:\/\/setkab.go.id\/en\/jakarta-bandung-high-speed-railway-project-to-be-completed-by-2021-transport-minister\/#primaryimage","url":"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/02\/img-20200223-wa0018-1.jpg","contentUrl":"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/02\/img-20200223-wa0018-1.jpg","width":600,"height":340,"caption":"Transportation Minister in a group photo after reviewing two project work points in Purwakarta and Rancaekek, Bandung, Sunday (23\/2). (Photo by: Ministry of Transportation)"},{"@type":"BreadcrumbList","@id":"https:\/\/setkab.go.id\/en\/jakarta-bandung-high-speed-railway-project-to-be-completed-by-2021-transport-minister\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/setkab.go.id\/en\/"},{"@type":"ListItem","position":2,"name":"Jakarta-Bandung High Speed Railway Project to be Completed by 2021: Transport Minister"}]},{"@type":"WebSite","@id":"https:\/\/setkab.go.id\/#website","url":"https:\/\/setkab.go.id\/","name":"Sekretariat Kabinet Republik Indonesia","description":"Kabinet Merah Putih","publisher":{"@id":"https:\/\/setkab.go.id\/#organization"},"alternateName":"Setkab","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/setkab.go.id\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ENH"},{"@type":"Organization","@id":"https:\/\/setkab.go.id\/#organization","name":"Sekretariat Kabinet","alternateName":"Setkab","url":"https:\/\/setkab.go.id\/","logo":{"@type":"ImageObject","inLanguage":"ENH","@id":"https:\/\/setkab.go.id\/#\/schema\/logo\/image\/","url":"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/05\/garuda.png","contentUrl":"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/05\/garuda.png","width":720,"height":788,"caption":"Sekretariat Kabinet"},"image":{"@id":"https:\/\/setkab.go.id\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/id-id.facebook.com\/Setkabgoid","https:\/\/x.com\/setkabgoid","https:\/\/www.instagram.com\/sekretariat.kabinet\/","https:\/\/www.youtube.com\/channel\/UCey1BgbIUz6eVz2vywc2d7g","https:\/\/id.wikipedia.org\/wiki\/Sekretariat_Kabinet_Republik_Indonesia","https:\/\/www.tiktok.com\/@setkabgoid"]},{"@type":"Person","@id":"https:\/\/setkab.go.id\/#\/schema\/person\/ccc9c04099be79c6aa9ed45cb3bf345e","name":"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation","image":{"@type":"ImageObject","inLanguage":"ENH","@id":"https:\/\/setkab.go.id\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/8238a2781f78eec52de6cbadf268cdcab6067d59123790258ac87c2b257c0b3f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/8238a2781f78eec52de6cbadf268cdcab6067d59123790258ac87c2b257c0b3f?s=96&d=mm&r=g","caption":"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation"},"sameAs":["http:\/\/www.setkab.go.id"],"url":"https:\/\/setkab.go.id\/en\/author\/naster\/"}]}},"_links":{"self":[{"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/posts\/183690","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/users\/43"}],"replies":[{"embeddable":true,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/comments?post=183690"}],"version-history":[{"count":2,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/posts\/183690\/revisions"}],"predecessor-version":[{"id":183869,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/posts\/183690\/revisions\/183869"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/media\/183735"}],"wp:attachment":[{"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/media?parent=183690"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/categories?post=183690"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/tags?post=183690"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}