{"id":187825,"date":"2020-04-03T16:01:28","date_gmt":"2020-04-03T09:01:28","guid":{"rendered":"https:\/\/setkab.go.id\/?p=187825"},"modified":"2020-04-06T16:13:46","modified_gmt":"2020-04-06T09:13:46","slug":"433-remote-villages-to-receive-electricity-this-year","status":"publish","type":"post","link":"https:\/\/setkab.go.id\/en\/433-remote-villages-to-receive-electricity-this-year\/","title":{"rendered":"433 Remote Villages To Receive Electricity This Year"},"content":{"rendered":"<div id=\"attachment_187826\" style=\"width: 1034px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-187826\" class=\"size-full wp-image-187826\" src=\"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/04\/Menteri-ESDM-433-Desa-Teraliri-listrik.jpg\" alt=\"\" width=\"1024\" height=\"683\" \/><p id=\"caption-attachment-187826\" class=\"wp-caption-text\">Minister of Energy and Mineral Resources gives a press statement after a Limited Meeting through video conference, Friday (3\/4). (Photo by: Ibrahim\/PR)<\/p><\/div>\n<p>The Government has announced plan to supply electricity to 433 remote villages and 4,191 households this year.<\/p>\n<p>\u201cIn accordance with the law, the state must guarantee the availability of affordable energy,\u201d Minister of Energy and Mineral Resources Arifin Tasrif said on Friday (3\/4).<\/p>\n<p>\u201cOut of 83,436 villages in the country, 83,003 villages have been electrified, meaning that the remaining 433 villages have not,\u201d he said, adding that electricity has so far been provided by state-owned electricity company PT PLN in 74,430 villages.<\/p>\n<p>Meanwhile, the remaining 5,515 villages, he added, are supplied by non-governmental organizations and assistance from the local governments.<\/p>\n<p>\u201cSince two years ago, we\u2019ve provided electricity by installing 3,058 solar-powered energy saving lamps (LTSHE). This is a temporary measure,\u201d he said.<\/p>\n<p>The Minister added that villages which have not been electrified are located in Papua province (324 villages), West Papua province (103 villages), East Nusa Tenggara province (5 villages), and Maluku province (one village).<\/p>\n<p>\u201cPT PLN has reported it has already mapped out the locations of those villages. There are still many villages, particularly in \u200b\u200bPapua province which still have difficulties in getting supplies from the grids,\u201d he said.<\/p>\n<p>For this reason, Arifin said that new technology is needed to secure supply.<\/p>\n<p>\u201cWe carried out the same program in 2021 to replace the LTSHE, which lasted less than three years. In 2022, we will take the same measure,\u201d he said, adding that the households will also be supplied so there will be a rise in electricity usage for households to support household industries.<\/p>\n<p>Arifin further said that electrification ratio since 2015 has been at 88.3 percent, while ratio of electrified villages has reached 96.95 percent.<\/p>\n<p>\u201cBy the end of 2020, electrification ratio is expected to reach 98.93 percent, almost close to the village ratio which has reached 99.48 percent,\u201d he said.<\/p>\n<p>\u201cGenerally, we will use renewable energy. Voltages come from solar panels. We also provide electric energy charging stations as well as pico-hydro power plants,\u201d he added.<\/p>\n<p>The pico-hydro, according to the Minister, is smaller than micro hydro, which is on a scale of hundreds of kilowatts.<\/p>\n<p>There is also a hybrid power plant that will use diesel for its backups and PLN\u2019s grid, he added.<\/p>\n<p>The Minister also revealed the number of potential customers in those villages, among others, 4,000 potential customers in Papua and West Papua, 177 potential customers in East Nusa Tenggara, 30 customers in Maluku,\u201d he said.<\/p>\n<p>For the record, funding for this village electricity program is sourced from the Central Government\u2019s budget, the Papua special autonomy budget, infrastructure fund, and the Village Funds.<\/p>\n<p>\u201cThis is one of the government\u2019s programs for energy distribution by utilizing renewable energy sources to be incorporated in the national energy supply system,\u201d he said. (FID\/EN)<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><strong>Translator: Muhardi<\/strong><br \/>\n<strong>Reviewed by: M. Ersan Pamungkas<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Government has announced plan to supply electricity to 433 remote villages and 4,191 households this year. \u201cIn accordance with the law, the state must guarantee the availability of affordable energy,\u201d Minister of Energy and Mineral Resources Arifin Tasrif said on Friday (3\/4). \u201cOut of 83,436 villages in the country, 83,003 villages have been electrified, [&hellip;]<\/p>\n","protected":false},"author":43,"featured_media":187826,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[77,66],"tags":[],"class_list":["post-187825","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-uncategorized-en"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v24.1 (Yoast SEO v26.1.1) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>433 Remote Villages To Receive Electricity This Year - Sekretariat Kabinet Republik Indonesia<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/setkab.go.id\/en\/433-remote-villages-to-receive-electricity-this-year\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"433 Remote Villages To Receive Electricity This Year - Sekretariat Kabinet Republik Indonesia\" \/>\n<meta property=\"og:description\" content=\"The Government has announced plan to supply electricity to 433 remote villages and 4,191 households this year. \u201cIn accordance with the law, the state must guarantee the availability of affordable energy,\u201d Minister of Energy and Mineral Resources Arifin Tasrif said on Friday (3\/4). \u201cOut of 83,436 villages in the country, 83,003 villages have been electrified, [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/setkab.go.id\/en\/433-remote-villages-to-receive-electricity-this-year\/\" \/>\n<meta property=\"og:site_name\" content=\"Sekretariat Kabinet Republik Indonesia\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/id-id.facebook.com\/Setkabgoid\" \/>\n<meta property=\"article:published_time\" content=\"2020-04-03T09:01:28+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2020-04-06T09:13:46+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/04\/Menteri-ESDM-433-Desa-Teraliri-listrik.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"683\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@setkabgoid\" \/>\n<meta name=\"twitter:site\" content=\"@setkabgoid\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"NewsArticle\",\"@id\":\"https:\/\/setkab.go.id\/en\/433-remote-villages-to-receive-electricity-this-year\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/setkab.go.id\/en\/433-remote-villages-to-receive-electricity-this-year\/\"},\"author\":{\"name\":\"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation\",\"@id\":\"https:\/\/setkab.go.id\/#\/schema\/person\/ccc9c04099be79c6aa9ed45cb3bf345e\"},\"headline\":\"433 Remote Villages To Receive Electricity This Year\",\"datePublished\":\"2020-04-03T09:01:28+00:00\",\"dateModified\":\"2020-04-06T09:13:46+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/setkab.go.id\/en\/433-remote-villages-to-receive-electricity-this-year\/\"},\"wordCount\":483,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/setkab.go.id\/#organization\"},\"image\":{\"@id\":\"https:\/\/setkab.go.id\/en\/433-remote-villages-to-receive-electricity-this-year\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/04\/Menteri-ESDM-433-Desa-Teraliri-listrik.jpg\",\"articleSection\":[\"News\",\"Uncategorized @en\"],\"inLanguage\":\"ENH\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/setkab.go.id\/en\/433-remote-villages-to-receive-electricity-this-year\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/setkab.go.id\/en\/433-remote-villages-to-receive-electricity-this-year\/\",\"url\":\"https:\/\/setkab.go.id\/en\/433-remote-villages-to-receive-electricity-this-year\/\",\"name\":\"433 Remote Villages To Receive Electricity This Year - Sekretariat Kabinet Republik Indonesia\",\"isPartOf\":{\"@id\":\"https:\/\/setkab.go.id\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/setkab.go.id\/en\/433-remote-villages-to-receive-electricity-this-year\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/setkab.go.id\/en\/433-remote-villages-to-receive-electricity-this-year\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/04\/Menteri-ESDM-433-Desa-Teraliri-listrik.jpg\",\"datePublished\":\"2020-04-03T09:01:28+00:00\",\"dateModified\":\"2020-04-06T09:13:46+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/setkab.go.id\/en\/433-remote-villages-to-receive-electricity-this-year\/#breadcrumb\"},\"inLanguage\":\"ENH\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/setkab.go.id\/en\/433-remote-villages-to-receive-electricity-this-year\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ENH\",\"@id\":\"https:\/\/setkab.go.id\/en\/433-remote-villages-to-receive-electricity-this-year\/#primaryimage\",\"url\":\"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/04\/Menteri-ESDM-433-Desa-Teraliri-listrik.jpg\",\"contentUrl\":\"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/04\/Menteri-ESDM-433-Desa-Teraliri-listrik.jpg\",\"width\":1024,\"height\":683,\"caption\":\"Minister of Energy and Mineral Resources gives a press statement after a Limited Meeting through video conference, Friday (3\/4). (Photo by: Ibrahim\/PR)\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/setkab.go.id\/en\/433-remote-villages-to-receive-electricity-this-year\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/setkab.go.id\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"433 Remote Villages To Receive Electricity This Year\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/setkab.go.id\/#website\",\"url\":\"https:\/\/setkab.go.id\/\",\"name\":\"Sekretariat Kabinet Republik Indonesia\",\"description\":\"Kabinet Merah Putih\",\"publisher\":{\"@id\":\"https:\/\/setkab.go.id\/#organization\"},\"alternateName\":\"Setkab\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/setkab.go.id\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ENH\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/setkab.go.id\/#organization\",\"name\":\"Sekretariat Kabinet\",\"alternateName\":\"Setkab\",\"url\":\"https:\/\/setkab.go.id\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ENH\",\"@id\":\"https:\/\/setkab.go.id\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/05\/garuda.png\",\"contentUrl\":\"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/05\/garuda.png\",\"width\":720,\"height\":788,\"caption\":\"Sekretariat Kabinet\"},\"image\":{\"@id\":\"https:\/\/setkab.go.id\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/id-id.facebook.com\/Setkabgoid\",\"https:\/\/x.com\/setkabgoid\",\"https:\/\/www.instagram.com\/sekretariat.kabinet\/\",\"https:\/\/www.youtube.com\/channel\/UCey1BgbIUz6eVz2vywc2d7g\",\"https:\/\/id.wikipedia.org\/wiki\/Sekretariat_Kabinet_Republik_Indonesia\",\"https:\/\/www.tiktok.com\/@setkabgoid\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/setkab.go.id\/#\/schema\/person\/ccc9c04099be79c6aa9ed45cb3bf345e\",\"name\":\"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ENH\",\"@id\":\"https:\/\/setkab.go.id\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/8238a2781f78eec52de6cbadf268cdcab6067d59123790258ac87c2b257c0b3f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/8238a2781f78eec52de6cbadf268cdcab6067d59123790258ac87c2b257c0b3f?s=96&d=mm&r=g\",\"caption\":\"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation\"},\"sameAs\":[\"http:\/\/www.setkab.go.id\"],\"url\":\"https:\/\/setkab.go.id\/en\/author\/naster\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"433 Remote Villages To Receive Electricity This Year - Sekretariat Kabinet Republik Indonesia","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/setkab.go.id\/en\/433-remote-villages-to-receive-electricity-this-year\/","og_locale":"en_US","og_type":"article","og_title":"433 Remote Villages To Receive Electricity This Year - Sekretariat Kabinet Republik Indonesia","og_description":"The Government has announced plan to supply electricity to 433 remote villages and 4,191 households this year. \u201cIn accordance with the law, the state must guarantee the availability of affordable energy,\u201d Minister of Energy and Mineral Resources Arifin Tasrif said on Friday (3\/4). \u201cOut of 83,436 villages in the country, 83,003 villages have been electrified, [&hellip;]","og_url":"https:\/\/setkab.go.id\/en\/433-remote-villages-to-receive-electricity-this-year\/","og_site_name":"Sekretariat Kabinet Republik Indonesia","article_publisher":"https:\/\/id-id.facebook.com\/Setkabgoid","article_published_time":"2020-04-03T09:01:28+00:00","article_modified_time":"2020-04-06T09:13:46+00:00","og_image":[{"width":1024,"height":683,"url":"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/04\/Menteri-ESDM-433-Desa-Teraliri-listrik.jpg","type":"image\/jpeg"}],"author":"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation","twitter_card":"summary_large_image","twitter_creator":"@setkabgoid","twitter_site":"@setkabgoid","twitter_misc":{"Written by":"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"NewsArticle","@id":"https:\/\/setkab.go.id\/en\/433-remote-villages-to-receive-electricity-this-year\/#article","isPartOf":{"@id":"https:\/\/setkab.go.id\/en\/433-remote-villages-to-receive-electricity-this-year\/"},"author":{"name":"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation","@id":"https:\/\/setkab.go.id\/#\/schema\/person\/ccc9c04099be79c6aa9ed45cb3bf345e"},"headline":"433 Remote Villages To Receive Electricity This Year","datePublished":"2020-04-03T09:01:28+00:00","dateModified":"2020-04-06T09:13:46+00:00","mainEntityOfPage":{"@id":"https:\/\/setkab.go.id\/en\/433-remote-villages-to-receive-electricity-this-year\/"},"wordCount":483,"commentCount":0,"publisher":{"@id":"https:\/\/setkab.go.id\/#organization"},"image":{"@id":"https:\/\/setkab.go.id\/en\/433-remote-villages-to-receive-electricity-this-year\/#primaryimage"},"thumbnailUrl":"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/04\/Menteri-ESDM-433-Desa-Teraliri-listrik.jpg","articleSection":["News","Uncategorized @en"],"inLanguage":"ENH","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/setkab.go.id\/en\/433-remote-villages-to-receive-electricity-this-year\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/setkab.go.id\/en\/433-remote-villages-to-receive-electricity-this-year\/","url":"https:\/\/setkab.go.id\/en\/433-remote-villages-to-receive-electricity-this-year\/","name":"433 Remote Villages To Receive Electricity This Year - Sekretariat Kabinet Republik Indonesia","isPartOf":{"@id":"https:\/\/setkab.go.id\/#website"},"primaryImageOfPage":{"@id":"https:\/\/setkab.go.id\/en\/433-remote-villages-to-receive-electricity-this-year\/#primaryimage"},"image":{"@id":"https:\/\/setkab.go.id\/en\/433-remote-villages-to-receive-electricity-this-year\/#primaryimage"},"thumbnailUrl":"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/04\/Menteri-ESDM-433-Desa-Teraliri-listrik.jpg","datePublished":"2020-04-03T09:01:28+00:00","dateModified":"2020-04-06T09:13:46+00:00","breadcrumb":{"@id":"https:\/\/setkab.go.id\/en\/433-remote-villages-to-receive-electricity-this-year\/#breadcrumb"},"inLanguage":"ENH","potentialAction":[{"@type":"ReadAction","target":["https:\/\/setkab.go.id\/en\/433-remote-villages-to-receive-electricity-this-year\/"]}]},{"@type":"ImageObject","inLanguage":"ENH","@id":"https:\/\/setkab.go.id\/en\/433-remote-villages-to-receive-electricity-this-year\/#primaryimage","url":"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/04\/Menteri-ESDM-433-Desa-Teraliri-listrik.jpg","contentUrl":"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/04\/Menteri-ESDM-433-Desa-Teraliri-listrik.jpg","width":1024,"height":683,"caption":"Minister of Energy and Mineral Resources gives a press statement after a Limited Meeting through video conference, Friday (3\/4). (Photo by: Ibrahim\/PR)"},{"@type":"BreadcrumbList","@id":"https:\/\/setkab.go.id\/en\/433-remote-villages-to-receive-electricity-this-year\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/setkab.go.id\/en\/"},{"@type":"ListItem","position":2,"name":"433 Remote Villages To Receive Electricity This Year"}]},{"@type":"WebSite","@id":"https:\/\/setkab.go.id\/#website","url":"https:\/\/setkab.go.id\/","name":"Sekretariat Kabinet Republik Indonesia","description":"Kabinet Merah Putih","publisher":{"@id":"https:\/\/setkab.go.id\/#organization"},"alternateName":"Setkab","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/setkab.go.id\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ENH"},{"@type":"Organization","@id":"https:\/\/setkab.go.id\/#organization","name":"Sekretariat Kabinet","alternateName":"Setkab","url":"https:\/\/setkab.go.id\/","logo":{"@type":"ImageObject","inLanguage":"ENH","@id":"https:\/\/setkab.go.id\/#\/schema\/logo\/image\/","url":"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/05\/garuda.png","contentUrl":"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/05\/garuda.png","width":720,"height":788,"caption":"Sekretariat Kabinet"},"image":{"@id":"https:\/\/setkab.go.id\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/id-id.facebook.com\/Setkabgoid","https:\/\/x.com\/setkabgoid","https:\/\/www.instagram.com\/sekretariat.kabinet\/","https:\/\/www.youtube.com\/channel\/UCey1BgbIUz6eVz2vywc2d7g","https:\/\/id.wikipedia.org\/wiki\/Sekretariat_Kabinet_Republik_Indonesia","https:\/\/www.tiktok.com\/@setkabgoid"]},{"@type":"Person","@id":"https:\/\/setkab.go.id\/#\/schema\/person\/ccc9c04099be79c6aa9ed45cb3bf345e","name":"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation","image":{"@type":"ImageObject","inLanguage":"ENH","@id":"https:\/\/setkab.go.id\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/8238a2781f78eec52de6cbadf268cdcab6067d59123790258ac87c2b257c0b3f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/8238a2781f78eec52de6cbadf268cdcab6067d59123790258ac87c2b257c0b3f?s=96&d=mm&r=g","caption":"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation"},"sameAs":["http:\/\/www.setkab.go.id"],"url":"https:\/\/setkab.go.id\/en\/author\/naster\/"}]}},"_links":{"self":[{"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/posts\/187825","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/users\/43"}],"replies":[{"embeddable":true,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/comments?post=187825"}],"version-history":[{"count":1,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/posts\/187825\/revisions"}],"predecessor-version":[{"id":187827,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/posts\/187825\/revisions\/187827"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/media\/187826"}],"wp:attachment":[{"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/media?parent=187825"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/categories?post=187825"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/tags?post=187825"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}