{"id":197166,"date":"2020-09-03T13:18:52","date_gmt":"2020-09-03T06:18:52","guid":{"rendered":"https:\/\/setkab.go.id\/?p=197166"},"modified":"2020-09-04T13:21:16","modified_gmt":"2020-09-04T06:21:16","slug":"cengkareng-batu-ceper-kunciran-toll-road-reaches-86-46-progress","status":"publish","type":"post","link":"https:\/\/setkab.go.id\/en\/cengkareng-batu-ceper-kunciran-toll-road-reaches-86-46-progress\/","title":{"rendered":"Cengkareng &#8211; Batu Ceper &#8211; Kunciran Toll Road Reaches 86.46% Progress"},"content":{"rendered":"<div id=\"attachment_197167\" style=\"width: 1290px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-197167\" class=\"size-full wp-image-197167\" src=\"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/09\/IMG-20200903-WA0080-1.jpg\" alt=\"\" width=\"1280\" height=\"711\" \/><p id=\"caption-attachment-197167\" class=\"wp-caption-text\">The Cengkareng &#8211; Batu Ceper &#8211; Kunciran Toll Road Section stretches 14.19 kilometers. (Photo by: Ministry of Public Works and Public Housing)<\/p><\/div>\n<p>Ministry of Public Works and Public Housing has committed to improving road and bridge infrastructure services, both toll roads and national roads to support logistics channels, especially to ensure the national economic recovery due to the COVID-19 Pandemic.<\/p>\n<p>One of the toll roads being completed is the 14.19 kilometer Cengkareng &#8211; Batu Ceper &#8211; Kunciran Toll Road with 86.46% progress.<\/p>\n<p>Minister of Public Works and Public Housing Basuki Hadimuljono said that the existence of toll roads that are connected to productive areas would reduce logistics costs and increase the competitiveness of domestic products.<\/p>\n<p>The Cengkareng &#8211; Batuceper &#8211; Kunciran Toll Road is one of the 6 sections of the Jakarta Outer Ring Road (JORR II) Toll Road, as an effort to support connectivity in the Greater Jakarta metropolitan area while reducing the traffic load on the JORR I Toll Road which is getting denser every day.<\/p>\n<p>Head of the Toll Road Regulatory Agency (BPJT) of the Ministry Danang Parikesit stated that the JORR II Toll Road will also serve as a means to distribute logistics to and from industrial areas around the capital city of Jakarta, such as Banten.<\/p>\n<p>The JORR II Toll Road is divided into 6 sections, namely Cengkareng &#8211; Batu Ceper &#8211; Kunciran Toll Road (14.19 km), Kunciran &#8211; Serpong Toll Road (11.4 km), Serpong &#8211; Cinere Toll Road (10.14 km), Cinere &#8211; Jagorawi Toll Road (14.64 km), Cimanggis &#8211; Cibitung Toll Road (25.39 km), and Cibitung &#8211; Cilincing Toll Road (34.02 km).<\/p>\n<p>The 14.19 km Cengkareng &#8211; Batuceper &#8211; Kunciran Toll Road is divided into 4 sections, namely 2.04 km of Section I (Kunciran &#8211; Tirtayasa), 3.52 km of Section II (Tirtayasa &#8211; Benteng Betawi), 6.57 km of Section III (Benteng Betawi &#8211; H.Sastranegara) and 2.06 km of Section IV (H.Sastranegara &#8211; SS Benda).<\/p>\n<p>The Cengkareng &#8211; Batuceper &#8211; Kunciran Toll Road which is managed by PT Jasamarga Kunciran Cengkareng (JKC) is expected to be completed by the end of 2020. In addition, this toll road is also presumed to be an alternative access to Soekarno-Hatta International Airport and its surrounding areas.<\/p>\n<p>Furthermore, the Cengkareng &#8211; Batuceper &#8211; Kunciran Toll Road will also be connected to the Serpong &#8211; Cinere Toll Road, which is also scheduled for completion at the end of 2020. This Toll Road will also be connected to the Kunciran &#8211; Serpong Toll Road, which has been operating and inaugurated by President Jokowi since December 2019. (<strong>BKP Kementerian PUPR\/EN)<\/strong><\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><strong>Translated by: Fairuzzamani Inayatillah<\/strong><br \/>\n<strong>Reviewed by: Mia M. Bonaedy<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Ministry of Public Works and Public Housing has committed to improving road and bridge infrastructure services, both toll roads and national roads to support logistics channels, especially to ensure the national economic recovery due to the COVID-19 Pandemic. One of the toll roads being completed is the 14.19 kilometer Cengkareng &#8211; Batu Ceper &#8211; Kunciran [&hellip;]<\/p>\n","protected":false},"author":43,"featured_media":197167,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[77,66],"tags":[],"class_list":["post-197166","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-uncategorized-en"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v24.1 (Yoast SEO v26.1.1) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Cengkareng - Batu Ceper - Kunciran Toll Road Reaches 86.46% Progress - Sekretariat Kabinet Republik Indonesia<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/setkab.go.id\/en\/cengkareng-batu-ceper-kunciran-toll-road-reaches-86-46-progress\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Cengkareng - Batu Ceper - Kunciran Toll Road Reaches 86.46% Progress - Sekretariat Kabinet Republik Indonesia\" \/>\n<meta property=\"og:description\" content=\"Ministry of Public Works and Public Housing has committed to improving road and bridge infrastructure services, both toll roads and national roads to support logistics channels, especially to ensure the national economic recovery due to the COVID-19 Pandemic. One of the toll roads being completed is the 14.19 kilometer Cengkareng &#8211; Batu Ceper &#8211; Kunciran [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/setkab.go.id\/en\/cengkareng-batu-ceper-kunciran-toll-road-reaches-86-46-progress\/\" \/>\n<meta property=\"og:site_name\" content=\"Sekretariat Kabinet Republik Indonesia\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/id-id.facebook.com\/Setkabgoid\" \/>\n<meta property=\"article:published_time\" content=\"2020-09-03T06:18:52+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2020-09-04T06:21:16+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/09\/IMG-20200903-WA0080-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1280\" \/>\n\t<meta property=\"og:image:height\" content=\"711\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@setkabgoid\" \/>\n<meta name=\"twitter:site\" content=\"@setkabgoid\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"NewsArticle\",\"@id\":\"https:\/\/setkab.go.id\/en\/cengkareng-batu-ceper-kunciran-toll-road-reaches-86-46-progress\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/setkab.go.id\/en\/cengkareng-batu-ceper-kunciran-toll-road-reaches-86-46-progress\/\"},\"author\":{\"name\":\"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation\",\"@id\":\"https:\/\/setkab.go.id\/#\/schema\/person\/ccc9c04099be79c6aa9ed45cb3bf345e\"},\"headline\":\"Cengkareng &#8211; Batu Ceper &#8211; Kunciran Toll Road Reaches 86.46% Progress\",\"datePublished\":\"2020-09-03T06:18:52+00:00\",\"dateModified\":\"2020-09-04T06:21:16+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/setkab.go.id\/en\/cengkareng-batu-ceper-kunciran-toll-road-reaches-86-46-progress\/\"},\"wordCount\":439,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/setkab.go.id\/#organization\"},\"image\":{\"@id\":\"https:\/\/setkab.go.id\/en\/cengkareng-batu-ceper-kunciran-toll-road-reaches-86-46-progress\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/09\/IMG-20200903-WA0080-1.jpg\",\"articleSection\":[\"News\",\"Uncategorized @en\"],\"inLanguage\":\"ENH\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/setkab.go.id\/en\/cengkareng-batu-ceper-kunciran-toll-road-reaches-86-46-progress\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/setkab.go.id\/en\/cengkareng-batu-ceper-kunciran-toll-road-reaches-86-46-progress\/\",\"url\":\"https:\/\/setkab.go.id\/en\/cengkareng-batu-ceper-kunciran-toll-road-reaches-86-46-progress\/\",\"name\":\"Cengkareng - Batu Ceper - Kunciran Toll Road Reaches 86.46% Progress - Sekretariat Kabinet Republik Indonesia\",\"isPartOf\":{\"@id\":\"https:\/\/setkab.go.id\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/setkab.go.id\/en\/cengkareng-batu-ceper-kunciran-toll-road-reaches-86-46-progress\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/setkab.go.id\/en\/cengkareng-batu-ceper-kunciran-toll-road-reaches-86-46-progress\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/09\/IMG-20200903-WA0080-1.jpg\",\"datePublished\":\"2020-09-03T06:18:52+00:00\",\"dateModified\":\"2020-09-04T06:21:16+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/setkab.go.id\/en\/cengkareng-batu-ceper-kunciran-toll-road-reaches-86-46-progress\/#breadcrumb\"},\"inLanguage\":\"ENH\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/setkab.go.id\/en\/cengkareng-batu-ceper-kunciran-toll-road-reaches-86-46-progress\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ENH\",\"@id\":\"https:\/\/setkab.go.id\/en\/cengkareng-batu-ceper-kunciran-toll-road-reaches-86-46-progress\/#primaryimage\",\"url\":\"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/09\/IMG-20200903-WA0080-1.jpg\",\"contentUrl\":\"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/09\/IMG-20200903-WA0080-1.jpg\",\"width\":1280,\"height\":711,\"caption\":\"The Cengkareng - Batu Ceper - Kunciran Toll Road Section stretches 14.19 kilometers. (Photo by: Ministry of Public Works and Public Housing)\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/setkab.go.id\/en\/cengkareng-batu-ceper-kunciran-toll-road-reaches-86-46-progress\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/setkab.go.id\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Cengkareng &#8211; Batu Ceper &#8211; Kunciran Toll Road Reaches 86.46% Progress\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/setkab.go.id\/#website\",\"url\":\"https:\/\/setkab.go.id\/\",\"name\":\"Sekretariat Kabinet Republik Indonesia\",\"description\":\"Kabinet Merah Putih\",\"publisher\":{\"@id\":\"https:\/\/setkab.go.id\/#organization\"},\"alternateName\":\"Setkab\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/setkab.go.id\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ENH\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/setkab.go.id\/#organization\",\"name\":\"Sekretariat Kabinet\",\"alternateName\":\"Setkab\",\"url\":\"https:\/\/setkab.go.id\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ENH\",\"@id\":\"https:\/\/setkab.go.id\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/05\/garuda.png\",\"contentUrl\":\"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/05\/garuda.png\",\"width\":720,\"height\":788,\"caption\":\"Sekretariat Kabinet\"},\"image\":{\"@id\":\"https:\/\/setkab.go.id\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/id-id.facebook.com\/Setkabgoid\",\"https:\/\/x.com\/setkabgoid\",\"https:\/\/www.instagram.com\/sekretariat.kabinet\/\",\"https:\/\/www.youtube.com\/channel\/UCey1BgbIUz6eVz2vywc2d7g\",\"https:\/\/id.wikipedia.org\/wiki\/Sekretariat_Kabinet_Republik_Indonesia\",\"https:\/\/www.tiktok.com\/@setkabgoid\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/setkab.go.id\/#\/schema\/person\/ccc9c04099be79c6aa9ed45cb3bf345e\",\"name\":\"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ENH\",\"@id\":\"https:\/\/setkab.go.id\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/8238a2781f78eec52de6cbadf268cdcab6067d59123790258ac87c2b257c0b3f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/8238a2781f78eec52de6cbadf268cdcab6067d59123790258ac87c2b257c0b3f?s=96&d=mm&r=g\",\"caption\":\"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation\"},\"sameAs\":[\"http:\/\/www.setkab.go.id\"],\"url\":\"https:\/\/setkab.go.id\/en\/author\/naster\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Cengkareng - Batu Ceper - Kunciran Toll Road Reaches 86.46% Progress - Sekretariat Kabinet Republik Indonesia","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/setkab.go.id\/en\/cengkareng-batu-ceper-kunciran-toll-road-reaches-86-46-progress\/","og_locale":"en_US","og_type":"article","og_title":"Cengkareng - Batu Ceper - Kunciran Toll Road Reaches 86.46% Progress - Sekretariat Kabinet Republik Indonesia","og_description":"Ministry of Public Works and Public Housing has committed to improving road and bridge infrastructure services, both toll roads and national roads to support logistics channels, especially to ensure the national economic recovery due to the COVID-19 Pandemic. One of the toll roads being completed is the 14.19 kilometer Cengkareng &#8211; Batu Ceper &#8211; Kunciran [&hellip;]","og_url":"https:\/\/setkab.go.id\/en\/cengkareng-batu-ceper-kunciran-toll-road-reaches-86-46-progress\/","og_site_name":"Sekretariat Kabinet Republik Indonesia","article_publisher":"https:\/\/id-id.facebook.com\/Setkabgoid","article_published_time":"2020-09-03T06:18:52+00:00","article_modified_time":"2020-09-04T06:21:16+00:00","og_image":[{"width":1280,"height":711,"url":"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/09\/IMG-20200903-WA0080-1.jpg","type":"image\/jpeg"}],"author":"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation","twitter_card":"summary_large_image","twitter_creator":"@setkabgoid","twitter_site":"@setkabgoid","twitter_misc":{"Written by":"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"NewsArticle","@id":"https:\/\/setkab.go.id\/en\/cengkareng-batu-ceper-kunciran-toll-road-reaches-86-46-progress\/#article","isPartOf":{"@id":"https:\/\/setkab.go.id\/en\/cengkareng-batu-ceper-kunciran-toll-road-reaches-86-46-progress\/"},"author":{"name":"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation","@id":"https:\/\/setkab.go.id\/#\/schema\/person\/ccc9c04099be79c6aa9ed45cb3bf345e"},"headline":"Cengkareng &#8211; Batu Ceper &#8211; Kunciran Toll Road Reaches 86.46% Progress","datePublished":"2020-09-03T06:18:52+00:00","dateModified":"2020-09-04T06:21:16+00:00","mainEntityOfPage":{"@id":"https:\/\/setkab.go.id\/en\/cengkareng-batu-ceper-kunciran-toll-road-reaches-86-46-progress\/"},"wordCount":439,"commentCount":0,"publisher":{"@id":"https:\/\/setkab.go.id\/#organization"},"image":{"@id":"https:\/\/setkab.go.id\/en\/cengkareng-batu-ceper-kunciran-toll-road-reaches-86-46-progress\/#primaryimage"},"thumbnailUrl":"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/09\/IMG-20200903-WA0080-1.jpg","articleSection":["News","Uncategorized @en"],"inLanguage":"ENH","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/setkab.go.id\/en\/cengkareng-batu-ceper-kunciran-toll-road-reaches-86-46-progress\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/setkab.go.id\/en\/cengkareng-batu-ceper-kunciran-toll-road-reaches-86-46-progress\/","url":"https:\/\/setkab.go.id\/en\/cengkareng-batu-ceper-kunciran-toll-road-reaches-86-46-progress\/","name":"Cengkareng - Batu Ceper - Kunciran Toll Road Reaches 86.46% Progress - Sekretariat Kabinet Republik Indonesia","isPartOf":{"@id":"https:\/\/setkab.go.id\/#website"},"primaryImageOfPage":{"@id":"https:\/\/setkab.go.id\/en\/cengkareng-batu-ceper-kunciran-toll-road-reaches-86-46-progress\/#primaryimage"},"image":{"@id":"https:\/\/setkab.go.id\/en\/cengkareng-batu-ceper-kunciran-toll-road-reaches-86-46-progress\/#primaryimage"},"thumbnailUrl":"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/09\/IMG-20200903-WA0080-1.jpg","datePublished":"2020-09-03T06:18:52+00:00","dateModified":"2020-09-04T06:21:16+00:00","breadcrumb":{"@id":"https:\/\/setkab.go.id\/en\/cengkareng-batu-ceper-kunciran-toll-road-reaches-86-46-progress\/#breadcrumb"},"inLanguage":"ENH","potentialAction":[{"@type":"ReadAction","target":["https:\/\/setkab.go.id\/en\/cengkareng-batu-ceper-kunciran-toll-road-reaches-86-46-progress\/"]}]},{"@type":"ImageObject","inLanguage":"ENH","@id":"https:\/\/setkab.go.id\/en\/cengkareng-batu-ceper-kunciran-toll-road-reaches-86-46-progress\/#primaryimage","url":"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/09\/IMG-20200903-WA0080-1.jpg","contentUrl":"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/09\/IMG-20200903-WA0080-1.jpg","width":1280,"height":711,"caption":"The Cengkareng - Batu Ceper - Kunciran Toll Road Section stretches 14.19 kilometers. (Photo by: Ministry of Public Works and Public Housing)"},{"@type":"BreadcrumbList","@id":"https:\/\/setkab.go.id\/en\/cengkareng-batu-ceper-kunciran-toll-road-reaches-86-46-progress\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/setkab.go.id\/en\/"},{"@type":"ListItem","position":2,"name":"Cengkareng &#8211; Batu Ceper &#8211; Kunciran Toll Road Reaches 86.46% Progress"}]},{"@type":"WebSite","@id":"https:\/\/setkab.go.id\/#website","url":"https:\/\/setkab.go.id\/","name":"Sekretariat Kabinet Republik Indonesia","description":"Kabinet Merah Putih","publisher":{"@id":"https:\/\/setkab.go.id\/#organization"},"alternateName":"Setkab","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/setkab.go.id\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ENH"},{"@type":"Organization","@id":"https:\/\/setkab.go.id\/#organization","name":"Sekretariat Kabinet","alternateName":"Setkab","url":"https:\/\/setkab.go.id\/","logo":{"@type":"ImageObject","inLanguage":"ENH","@id":"https:\/\/setkab.go.id\/#\/schema\/logo\/image\/","url":"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/05\/garuda.png","contentUrl":"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/05\/garuda.png","width":720,"height":788,"caption":"Sekretariat Kabinet"},"image":{"@id":"https:\/\/setkab.go.id\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/id-id.facebook.com\/Setkabgoid","https:\/\/x.com\/setkabgoid","https:\/\/www.instagram.com\/sekretariat.kabinet\/","https:\/\/www.youtube.com\/channel\/UCey1BgbIUz6eVz2vywc2d7g","https:\/\/id.wikipedia.org\/wiki\/Sekretariat_Kabinet_Republik_Indonesia","https:\/\/www.tiktok.com\/@setkabgoid"]},{"@type":"Person","@id":"https:\/\/setkab.go.id\/#\/schema\/person\/ccc9c04099be79c6aa9ed45cb3bf345e","name":"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation","image":{"@type":"ImageObject","inLanguage":"ENH","@id":"https:\/\/setkab.go.id\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/8238a2781f78eec52de6cbadf268cdcab6067d59123790258ac87c2b257c0b3f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/8238a2781f78eec52de6cbadf268cdcab6067d59123790258ac87c2b257c0b3f?s=96&d=mm&r=g","caption":"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation"},"sameAs":["http:\/\/www.setkab.go.id"],"url":"https:\/\/setkab.go.id\/en\/author\/naster\/"}]}},"_links":{"self":[{"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/posts\/197166","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/users\/43"}],"replies":[{"embeddable":true,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/comments?post=197166"}],"version-history":[{"count":1,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/posts\/197166\/revisions"}],"predecessor-version":[{"id":197168,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/posts\/197166\/revisions\/197168"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/media\/197167"}],"wp:attachment":[{"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/media?parent=197166"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/categories?post=197166"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/tags?post=197166"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}