{"id":209906,"date":"2021-02-24T11:15:07","date_gmt":"2021-02-24T04:15:07","guid":{"rendered":"https:\/\/setkab.go.id\/?p=209906"},"modified":"2021-02-25T11:17:26","modified_gmt":"2021-02-25T04:17:26","slug":"president-inspects-citarum-river-embankment-repair","status":"publish","type":"post","link":"https:\/\/setkab.go.id\/en\/president-inspects-citarum-river-embankment-repair\/","title":{"rendered":"President Inspects Citarum River Embankment Repair"},"content":{"rendered":"<div id=\"attachment_209908\" style=\"width: 1290px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-209908\" class=\"size-full wp-image-209908\" src=\"https:\/\/setkab.go.id\/wp-content\/uploads\/2021\/02\/citarum.jpg\" alt=\"\" width=\"1280\" height=\"853\" \/><p id=\"caption-attachment-209908\" class=\"wp-caption-text\">President Jokowi inspecting Citarum River embankment repair in Pebayuran sub-district, Bekasi regency, West Java province, Wednesday (24\/02\/2021). (Photo: Bureau of Press of Presidential Secretariat\/Lukas)<\/p><\/div>\n<p>President Joko \u201cJokowi\u201d Widodo on Wednesday (24\/02) inspected the repair of Citarum River embankment in Pebayuran sub-district, Bekasi regency, West Java province.<\/p>\n<p>The embankment broke on Saturday (20\/02\/2021) at approximately 10 pm and flooded several villages nearby.<\/p>\n<p>Speaking to the press after the inspection, the Head of State said that the embankment had been repaired since two days ago, adding that he has also ordered the embankment repair to be finished in two days.<\/p>\n<p>\u201cThe cracks were found at three points of the embankment. But two days ago, (the repair) was begun and, God willing, I have set a target that within two days the embankment (repair) should be finished, so everything can function normally again,\u201d he said.<\/p>\n<p>The Government, he added, will also immediately complete flood-damaged housing repair due to the broken Citarum River embankment.<\/p>\n<p>\u201cAs for the people who are affected, there are 30 here, the repair of their houses will be completed as soon as possible,\u201d stated President Jokowi.<\/p>\n<p>On that occasion, the President also inspected the backfill process in a flood-affected village as well as the housing of the people that has been damaged by floods.<\/p>\n<p>For the record, floods that occurred due to the broken Citarum River embankment affected 4,867 households, displacing 9,438 people and forcing them to evacuate to 17 locations in nine affected villages.<\/p>\n<p>Joining the president during the inspection were Minister of Public Works and Housing Basuki Hadimuljono, Minister of Social Affairs Tri Rismaharini, Head of the National Agency for Disaster Management Doni Monardo, Governor of West Java Ridwan Kamil, and Regent of Bekasi Eka Supria Atmaja.<strong> (FID\/UN) (DH\/EP)<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>President Joko \u201cJokowi\u201d Widodo on Wednesday (24\/02) inspected the repair of Citarum River embankment in Pebayuran sub-district, Bekasi regency, West Java province. The embankment broke on Saturday (20\/02\/2021) at approximately 10 pm and flooded several villages nearby. Speaking to the press after the inspection, the Head of State said that the embankment had been repaired [&hellip;]<\/p>\n","protected":false},"author":43,"featured_media":209908,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[77,66],"tags":[],"class_list":["post-209906","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-uncategorized-en"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v24.1 (Yoast SEO v26.1.1) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>President Inspects Citarum River Embankment Repair - Sekretariat Kabinet Republik Indonesia<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/setkab.go.id\/en\/president-inspects-citarum-river-embankment-repair\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"President Inspects Citarum River Embankment Repair - Sekretariat Kabinet Republik Indonesia\" \/>\n<meta property=\"og:description\" content=\"President Joko \u201cJokowi\u201d Widodo on Wednesday (24\/02) inspected the repair of Citarum River embankment in Pebayuran sub-district, Bekasi regency, West Java province. The embankment broke on Saturday (20\/02\/2021) at approximately 10 pm and flooded several villages nearby. Speaking to the press after the inspection, the Head of State said that the embankment had been repaired [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/setkab.go.id\/en\/president-inspects-citarum-river-embankment-repair\/\" \/>\n<meta property=\"og:site_name\" content=\"Sekretariat Kabinet Republik Indonesia\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/id-id.facebook.com\/Setkabgoid\" \/>\n<meta property=\"article:published_time\" content=\"2021-02-24T04:15:07+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2021-02-25T04:17:26+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/setkab.go.id\/wp-content\/uploads\/2021\/02\/citarum.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1280\" \/>\n\t<meta property=\"og:image:height\" content=\"853\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@setkabgoid\" \/>\n<meta name=\"twitter:site\" content=\"@setkabgoid\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"NewsArticle\",\"@id\":\"https:\/\/setkab.go.id\/en\/president-inspects-citarum-river-embankment-repair\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/setkab.go.id\/en\/president-inspects-citarum-river-embankment-repair\/\"},\"author\":{\"name\":\"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation\",\"@id\":\"https:\/\/setkab.go.id\/#\/schema\/person\/ccc9c04099be79c6aa9ed45cb3bf345e\"},\"headline\":\"President Inspects Citarum River Embankment Repair\",\"datePublished\":\"2021-02-24T04:15:07+00:00\",\"dateModified\":\"2021-02-25T04:17:26+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/setkab.go.id\/en\/president-inspects-citarum-river-embankment-repair\/\"},\"wordCount\":299,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/setkab.go.id\/#organization\"},\"image\":{\"@id\":\"https:\/\/setkab.go.id\/en\/president-inspects-citarum-river-embankment-repair\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/setkab.go.id\/wp-content\/uploads\/2021\/02\/citarum.jpg\",\"articleSection\":[\"News\",\"Uncategorized @en\"],\"inLanguage\":\"ENH\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/setkab.go.id\/en\/president-inspects-citarum-river-embankment-repair\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/setkab.go.id\/en\/president-inspects-citarum-river-embankment-repair\/\",\"url\":\"https:\/\/setkab.go.id\/en\/president-inspects-citarum-river-embankment-repair\/\",\"name\":\"President Inspects Citarum River Embankment Repair - Sekretariat Kabinet Republik Indonesia\",\"isPartOf\":{\"@id\":\"https:\/\/setkab.go.id\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/setkab.go.id\/en\/president-inspects-citarum-river-embankment-repair\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/setkab.go.id\/en\/president-inspects-citarum-river-embankment-repair\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/setkab.go.id\/wp-content\/uploads\/2021\/02\/citarum.jpg\",\"datePublished\":\"2021-02-24T04:15:07+00:00\",\"dateModified\":\"2021-02-25T04:17:26+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/setkab.go.id\/en\/president-inspects-citarum-river-embankment-repair\/#breadcrumb\"},\"inLanguage\":\"ENH\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/setkab.go.id\/en\/president-inspects-citarum-river-embankment-repair\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ENH\",\"@id\":\"https:\/\/setkab.go.id\/en\/president-inspects-citarum-river-embankment-repair\/#primaryimage\",\"url\":\"https:\/\/setkab.go.id\/wp-content\/uploads\/2021\/02\/citarum.jpg\",\"contentUrl\":\"https:\/\/setkab.go.id\/wp-content\/uploads\/2021\/02\/citarum.jpg\",\"width\":1280,\"height\":853,\"caption\":\"President Jokowi inspecting Citarum River embankment repair in Pebayuran sub-district, Bekasi regency, West Java province, Wednesday (24\/02\/2021). (Photo: Bureau of Press of Presidential Secretariat\/Lukas)\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/setkab.go.id\/en\/president-inspects-citarum-river-embankment-repair\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/setkab.go.id\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"President Inspects Citarum River Embankment Repair\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/setkab.go.id\/#website\",\"url\":\"https:\/\/setkab.go.id\/\",\"name\":\"Sekretariat Kabinet Republik Indonesia\",\"description\":\"Kabinet Merah Putih\",\"publisher\":{\"@id\":\"https:\/\/setkab.go.id\/#organization\"},\"alternateName\":\"Setkab\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/setkab.go.id\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ENH\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/setkab.go.id\/#organization\",\"name\":\"Sekretariat Kabinet\",\"alternateName\":\"Setkab\",\"url\":\"https:\/\/setkab.go.id\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ENH\",\"@id\":\"https:\/\/setkab.go.id\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/05\/garuda.png\",\"contentUrl\":\"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/05\/garuda.png\",\"width\":720,\"height\":788,\"caption\":\"Sekretariat Kabinet\"},\"image\":{\"@id\":\"https:\/\/setkab.go.id\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/id-id.facebook.com\/Setkabgoid\",\"https:\/\/x.com\/setkabgoid\",\"https:\/\/www.instagram.com\/sekretariat.kabinet\/\",\"https:\/\/www.youtube.com\/channel\/UCey1BgbIUz6eVz2vywc2d7g\",\"https:\/\/id.wikipedia.org\/wiki\/Sekretariat_Kabinet_Republik_Indonesia\",\"https:\/\/www.tiktok.com\/@setkabgoid\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/setkab.go.id\/#\/schema\/person\/ccc9c04099be79c6aa9ed45cb3bf345e\",\"name\":\"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ENH\",\"@id\":\"https:\/\/setkab.go.id\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/8238a2781f78eec52de6cbadf268cdcab6067d59123790258ac87c2b257c0b3f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/8238a2781f78eec52de6cbadf268cdcab6067d59123790258ac87c2b257c0b3f?s=96&d=mm&r=g\",\"caption\":\"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation\"},\"sameAs\":[\"http:\/\/www.setkab.go.id\"],\"url\":\"https:\/\/setkab.go.id\/en\/author\/naster\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"President Inspects Citarum River Embankment Repair - Sekretariat Kabinet Republik Indonesia","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/setkab.go.id\/en\/president-inspects-citarum-river-embankment-repair\/","og_locale":"en_US","og_type":"article","og_title":"President Inspects Citarum River Embankment Repair - Sekretariat Kabinet Republik Indonesia","og_description":"President Joko \u201cJokowi\u201d Widodo on Wednesday (24\/02) inspected the repair of Citarum River embankment in Pebayuran sub-district, Bekasi regency, West Java province. The embankment broke on Saturday (20\/02\/2021) at approximately 10 pm and flooded several villages nearby. Speaking to the press after the inspection, the Head of State said that the embankment had been repaired [&hellip;]","og_url":"https:\/\/setkab.go.id\/en\/president-inspects-citarum-river-embankment-repair\/","og_site_name":"Sekretariat Kabinet Republik Indonesia","article_publisher":"https:\/\/id-id.facebook.com\/Setkabgoid","article_published_time":"2021-02-24T04:15:07+00:00","article_modified_time":"2021-02-25T04:17:26+00:00","og_image":[{"width":1280,"height":853,"url":"https:\/\/setkab.go.id\/wp-content\/uploads\/2021\/02\/citarum.jpg","type":"image\/jpeg"}],"author":"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation","twitter_card":"summary_large_image","twitter_creator":"@setkabgoid","twitter_site":"@setkabgoid","twitter_misc":{"Written by":"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"NewsArticle","@id":"https:\/\/setkab.go.id\/en\/president-inspects-citarum-river-embankment-repair\/#article","isPartOf":{"@id":"https:\/\/setkab.go.id\/en\/president-inspects-citarum-river-embankment-repair\/"},"author":{"name":"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation","@id":"https:\/\/setkab.go.id\/#\/schema\/person\/ccc9c04099be79c6aa9ed45cb3bf345e"},"headline":"President Inspects Citarum River Embankment Repair","datePublished":"2021-02-24T04:15:07+00:00","dateModified":"2021-02-25T04:17:26+00:00","mainEntityOfPage":{"@id":"https:\/\/setkab.go.id\/en\/president-inspects-citarum-river-embankment-repair\/"},"wordCount":299,"commentCount":0,"publisher":{"@id":"https:\/\/setkab.go.id\/#organization"},"image":{"@id":"https:\/\/setkab.go.id\/en\/president-inspects-citarum-river-embankment-repair\/#primaryimage"},"thumbnailUrl":"https:\/\/setkab.go.id\/wp-content\/uploads\/2021\/02\/citarum.jpg","articleSection":["News","Uncategorized @en"],"inLanguage":"ENH","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/setkab.go.id\/en\/president-inspects-citarum-river-embankment-repair\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/setkab.go.id\/en\/president-inspects-citarum-river-embankment-repair\/","url":"https:\/\/setkab.go.id\/en\/president-inspects-citarum-river-embankment-repair\/","name":"President Inspects Citarum River Embankment Repair - Sekretariat Kabinet Republik Indonesia","isPartOf":{"@id":"https:\/\/setkab.go.id\/#website"},"primaryImageOfPage":{"@id":"https:\/\/setkab.go.id\/en\/president-inspects-citarum-river-embankment-repair\/#primaryimage"},"image":{"@id":"https:\/\/setkab.go.id\/en\/president-inspects-citarum-river-embankment-repair\/#primaryimage"},"thumbnailUrl":"https:\/\/setkab.go.id\/wp-content\/uploads\/2021\/02\/citarum.jpg","datePublished":"2021-02-24T04:15:07+00:00","dateModified":"2021-02-25T04:17:26+00:00","breadcrumb":{"@id":"https:\/\/setkab.go.id\/en\/president-inspects-citarum-river-embankment-repair\/#breadcrumb"},"inLanguage":"ENH","potentialAction":[{"@type":"ReadAction","target":["https:\/\/setkab.go.id\/en\/president-inspects-citarum-river-embankment-repair\/"]}]},{"@type":"ImageObject","inLanguage":"ENH","@id":"https:\/\/setkab.go.id\/en\/president-inspects-citarum-river-embankment-repair\/#primaryimage","url":"https:\/\/setkab.go.id\/wp-content\/uploads\/2021\/02\/citarum.jpg","contentUrl":"https:\/\/setkab.go.id\/wp-content\/uploads\/2021\/02\/citarum.jpg","width":1280,"height":853,"caption":"President Jokowi inspecting Citarum River embankment repair in Pebayuran sub-district, Bekasi regency, West Java province, Wednesday (24\/02\/2021). (Photo: Bureau of Press of Presidential Secretariat\/Lukas)"},{"@type":"BreadcrumbList","@id":"https:\/\/setkab.go.id\/en\/president-inspects-citarum-river-embankment-repair\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/setkab.go.id\/en\/"},{"@type":"ListItem","position":2,"name":"President Inspects Citarum River Embankment Repair"}]},{"@type":"WebSite","@id":"https:\/\/setkab.go.id\/#website","url":"https:\/\/setkab.go.id\/","name":"Sekretariat Kabinet Republik Indonesia","description":"Kabinet Merah Putih","publisher":{"@id":"https:\/\/setkab.go.id\/#organization"},"alternateName":"Setkab","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/setkab.go.id\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ENH"},{"@type":"Organization","@id":"https:\/\/setkab.go.id\/#organization","name":"Sekretariat Kabinet","alternateName":"Setkab","url":"https:\/\/setkab.go.id\/","logo":{"@type":"ImageObject","inLanguage":"ENH","@id":"https:\/\/setkab.go.id\/#\/schema\/logo\/image\/","url":"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/05\/garuda.png","contentUrl":"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/05\/garuda.png","width":720,"height":788,"caption":"Sekretariat Kabinet"},"image":{"@id":"https:\/\/setkab.go.id\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/id-id.facebook.com\/Setkabgoid","https:\/\/x.com\/setkabgoid","https:\/\/www.instagram.com\/sekretariat.kabinet\/","https:\/\/www.youtube.com\/channel\/UCey1BgbIUz6eVz2vywc2d7g","https:\/\/id.wikipedia.org\/wiki\/Sekretariat_Kabinet_Republik_Indonesia","https:\/\/www.tiktok.com\/@setkabgoid"]},{"@type":"Person","@id":"https:\/\/setkab.go.id\/#\/schema\/person\/ccc9c04099be79c6aa9ed45cb3bf345e","name":"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation","image":{"@type":"ImageObject","inLanguage":"ENH","@id":"https:\/\/setkab.go.id\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/8238a2781f78eec52de6cbadf268cdcab6067d59123790258ac87c2b257c0b3f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/8238a2781f78eec52de6cbadf268cdcab6067d59123790258ac87c2b257c0b3f?s=96&d=mm&r=g","caption":"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation"},"sameAs":["http:\/\/www.setkab.go.id"],"url":"https:\/\/setkab.go.id\/en\/author\/naster\/"}]}},"_links":{"self":[{"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/posts\/209906","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/users\/43"}],"replies":[{"embeddable":true,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/comments?post=209906"}],"version-history":[{"count":2,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/posts\/209906\/revisions"}],"predecessor-version":[{"id":209911,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/posts\/209906\/revisions\/209911"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/media\/209908"}],"wp:attachment":[{"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/media?parent=209906"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/categories?post=209906"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/tags?post=209906"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}