{"id":228142,"date":"2021-09-25T12:52:12","date_gmt":"2021-09-25T05:52:12","guid":{"rendered":"https:\/\/setkab.go.id\/?p=228142"},"modified":"2021-09-27T12:56:21","modified_gmt":"2021-09-27T05:56:21","slug":"trans-papua-road-construction-progresses-to-increase-connectivity","status":"publish","type":"post","link":"https:\/\/setkab.go.id\/en\/trans-papua-road-construction-progresses-to-increase-connectivity\/","title":{"rendered":"Trans-Papua Road Construction Progresses to Increase Connectivity"},"content":{"rendered":"<div id=\"attachment_228143\" style=\"width: 310px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-228143\" class=\"size-medium wp-image-228143\" src=\"https:\/\/setkab.go.id\/wp-content\/uploads\/2021\/09\/1-4-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/setkab.go.id\/wp-content\/uploads\/2021\/09\/1-4-300x225.jpg 300w, https:\/\/setkab.go.id\/wp-content\/uploads\/2021\/09\/1-4-1024x766.jpg 1024w, https:\/\/setkab.go.id\/wp-content\/uploads\/2021\/09\/1-4-768x575.jpg 768w, https:\/\/setkab.go.id\/wp-content\/uploads\/2021\/09\/1-4-600x449.jpg 600w, https:\/\/setkab.go.id\/wp-content\/uploads\/2021\/09\/1-4-615x460.jpg 615w, https:\/\/setkab.go.id\/wp-content\/uploads\/2021\/09\/1-4-307x230.jpg 307w, https:\/\/setkab.go.id\/wp-content\/uploads\/2021\/09\/1-4.jpg 1280w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><p id=\"caption-attachment-228143\" class=\"wp-caption-text\">Special Staff to the President Billy Mambrasar during the inspection of Trans-Papua road construction. (Photo by: Team of Special Staff to the President Billy Mambrasar)<\/p><\/div>\n<p>The Government is currently building 3,462 kilometer-long Trans-Papua road that lays from Domberai customary land in Sorong city, West Papua province to Bumi Anim Ha customary land in Merauke regency in Papua province.<\/p>\n<p>This infrastructure construction is one of the national strategic projects and part of the 2020-2024 medium-term national development plan.<\/p>\n<p>\u201cSince 2015, President Jokowi has pushed for the acceleration of infrastructure construction in the land of Papua by continuing to work on Trans-Papua road construction that is 3,462-kilometer long,\u201d Special Staff to the President Billy Mambrasar said in his written statement, Friday (24\/09).<\/p>\n<p>The construction of Trans-Papua road is aimed to improve the wellbeing of Papuan people by enhancing access and interregional connectivity, which can open isolated areas. In addition, the construction of Trans-Papua road is also expected to reduce the cost of living index, poverty, and infrastructure disparity across Indonesia.<\/p>\n<p>\u201cConnecting the provinces of Papua and West Papua also connects the whole cities, districts, and villages in every part of the land of Papua,\u201d he added.<\/p>\n<p>The native Papuan Special Staff to the President also stated that President Joko \u201cJokowi\u201d Widodo has ordered him to directly inspect the development of the Trans-Papua road construction.<\/p>\n<p>\u201cTo date, 3,446 kilometers of Trans-Papua road has been built and it will be continued along with the construction of schools, places of worship, cross-border posts (PLBN), and so on,\u201d he said.<\/p>\n<p>Furthermore, since June 2021, Billy and Bring a Change Team have made several visits to Papua, crossing the provinces of Papua and West Papua, 15 regencies, 66 districts, and 278 villages.<\/p>\n<p>During this work visit, Billy not only inspected the progress of Trans-Papua road construction but also launched the Millennial Farmers program, inspected vaccination, met regional government officials, and received the people\u2019s complaints to be delivered to the President.<\/p>\n<p>\u201cWe all hope that Papua develops into other developed areas. Let us all work to realize it together,\u201d Billy remarked. <strong>(Communication Team of Special Staff to the President Billy Mambrasar) (DH\/MMB)<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Government is currently building 3,462 kilometer-long Trans-Papua road that lays from Domberai customary land in Sorong city, West Papua province to Bumi Anim Ha customary land in Merauke regency in Papua province. This infrastructure construction is one of the national strategic projects and part of the 2020-2024 medium-term national development plan. \u201cSince 2015, President [&hellip;]<\/p>\n","protected":false},"author":43,"featured_media":228143,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[77,66],"tags":[],"class_list":["post-228142","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-uncategorized-en"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v24.1 (Yoast SEO v26.1.1) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Trans-Papua Road Construction Progresses to Increase Connectivity - Sekretariat Kabinet Republik Indonesia<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/setkab.go.id\/en\/trans-papua-road-construction-progresses-to-increase-connectivity\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Trans-Papua Road Construction Progresses to Increase Connectivity - Sekretariat Kabinet Republik Indonesia\" \/>\n<meta property=\"og:description\" content=\"The Government is currently building 3,462 kilometer-long Trans-Papua road that lays from Domberai customary land in Sorong city, West Papua province to Bumi Anim Ha customary land in Merauke regency in Papua province. This infrastructure construction is one of the national strategic projects and part of the 2020-2024 medium-term national development plan. \u201cSince 2015, President [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/setkab.go.id\/en\/trans-papua-road-construction-progresses-to-increase-connectivity\/\" \/>\n<meta property=\"og:site_name\" content=\"Sekretariat Kabinet Republik Indonesia\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/id-id.facebook.com\/Setkabgoid\" \/>\n<meta property=\"article:published_time\" content=\"2021-09-25T05:52:12+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2021-09-27T05:56:21+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/setkab.go.id\/wp-content\/uploads\/2021\/09\/1-4.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1280\" \/>\n\t<meta property=\"og:image:height\" content=\"958\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@setkabgoid\" \/>\n<meta name=\"twitter:site\" content=\"@setkabgoid\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"NewsArticle\",\"@id\":\"https:\/\/setkab.go.id\/en\/trans-papua-road-construction-progresses-to-increase-connectivity\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/setkab.go.id\/en\/trans-papua-road-construction-progresses-to-increase-connectivity\/\"},\"author\":{\"name\":\"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation\",\"@id\":\"https:\/\/setkab.go.id\/#\/schema\/person\/ccc9c04099be79c6aa9ed45cb3bf345e\"},\"headline\":\"Trans-Papua Road Construction Progresses to Increase Connectivity\",\"datePublished\":\"2021-09-25T05:52:12+00:00\",\"dateModified\":\"2021-09-27T05:56:21+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/setkab.go.id\/en\/trans-papua-road-construction-progresses-to-increase-connectivity\/\"},\"wordCount\":362,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/setkab.go.id\/#organization\"},\"image\":{\"@id\":\"https:\/\/setkab.go.id\/en\/trans-papua-road-construction-progresses-to-increase-connectivity\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/setkab.go.id\/wp-content\/uploads\/2021\/09\/1-4.jpg\",\"articleSection\":[\"News\",\"Uncategorized @en\"],\"inLanguage\":\"ENH\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/setkab.go.id\/en\/trans-papua-road-construction-progresses-to-increase-connectivity\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/setkab.go.id\/en\/trans-papua-road-construction-progresses-to-increase-connectivity\/\",\"url\":\"https:\/\/setkab.go.id\/en\/trans-papua-road-construction-progresses-to-increase-connectivity\/\",\"name\":\"Trans-Papua Road Construction Progresses to Increase Connectivity - Sekretariat Kabinet Republik Indonesia\",\"isPartOf\":{\"@id\":\"https:\/\/setkab.go.id\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/setkab.go.id\/en\/trans-papua-road-construction-progresses-to-increase-connectivity\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/setkab.go.id\/en\/trans-papua-road-construction-progresses-to-increase-connectivity\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/setkab.go.id\/wp-content\/uploads\/2021\/09\/1-4.jpg\",\"datePublished\":\"2021-09-25T05:52:12+00:00\",\"dateModified\":\"2021-09-27T05:56:21+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/setkab.go.id\/en\/trans-papua-road-construction-progresses-to-increase-connectivity\/#breadcrumb\"},\"inLanguage\":\"ENH\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/setkab.go.id\/en\/trans-papua-road-construction-progresses-to-increase-connectivity\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ENH\",\"@id\":\"https:\/\/setkab.go.id\/en\/trans-papua-road-construction-progresses-to-increase-connectivity\/#primaryimage\",\"url\":\"https:\/\/setkab.go.id\/wp-content\/uploads\/2021\/09\/1-4.jpg\",\"contentUrl\":\"https:\/\/setkab.go.id\/wp-content\/uploads\/2021\/09\/1-4.jpg\",\"width\":1280,\"height\":958,\"caption\":\"Special Staff to the President Billy Mambrasar during the inspection of Trans-Papua road construction. (Photo by: Team of Special Staff to the President Billy Mambrasar)\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/setkab.go.id\/en\/trans-papua-road-construction-progresses-to-increase-connectivity\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/setkab.go.id\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Trans-Papua Road Construction Progresses to Increase Connectivity\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/setkab.go.id\/#website\",\"url\":\"https:\/\/setkab.go.id\/\",\"name\":\"Sekretariat Kabinet Republik Indonesia\",\"description\":\"Kabinet Merah Putih\",\"publisher\":{\"@id\":\"https:\/\/setkab.go.id\/#organization\"},\"alternateName\":\"Setkab\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/setkab.go.id\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ENH\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/setkab.go.id\/#organization\",\"name\":\"Sekretariat Kabinet\",\"alternateName\":\"Setkab\",\"url\":\"https:\/\/setkab.go.id\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ENH\",\"@id\":\"https:\/\/setkab.go.id\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/05\/garuda.png\",\"contentUrl\":\"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/05\/garuda.png\",\"width\":720,\"height\":788,\"caption\":\"Sekretariat Kabinet\"},\"image\":{\"@id\":\"https:\/\/setkab.go.id\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/id-id.facebook.com\/Setkabgoid\",\"https:\/\/x.com\/setkabgoid\",\"https:\/\/www.instagram.com\/sekretariat.kabinet\/\",\"https:\/\/www.youtube.com\/channel\/UCey1BgbIUz6eVz2vywc2d7g\",\"https:\/\/id.wikipedia.org\/wiki\/Sekretariat_Kabinet_Republik_Indonesia\",\"https:\/\/www.tiktok.com\/@setkabgoid\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/setkab.go.id\/#\/schema\/person\/ccc9c04099be79c6aa9ed45cb3bf345e\",\"name\":\"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ENH\",\"@id\":\"https:\/\/setkab.go.id\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/8238a2781f78eec52de6cbadf268cdcab6067d59123790258ac87c2b257c0b3f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/8238a2781f78eec52de6cbadf268cdcab6067d59123790258ac87c2b257c0b3f?s=96&d=mm&r=g\",\"caption\":\"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation\"},\"sameAs\":[\"http:\/\/www.setkab.go.id\"],\"url\":\"https:\/\/setkab.go.id\/en\/author\/naster\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Trans-Papua Road Construction Progresses to Increase Connectivity - Sekretariat Kabinet Republik Indonesia","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/setkab.go.id\/en\/trans-papua-road-construction-progresses-to-increase-connectivity\/","og_locale":"en_US","og_type":"article","og_title":"Trans-Papua Road Construction Progresses to Increase Connectivity - Sekretariat Kabinet Republik Indonesia","og_description":"The Government is currently building 3,462 kilometer-long Trans-Papua road that lays from Domberai customary land in Sorong city, West Papua province to Bumi Anim Ha customary land in Merauke regency in Papua province. This infrastructure construction is one of the national strategic projects and part of the 2020-2024 medium-term national development plan. \u201cSince 2015, President [&hellip;]","og_url":"https:\/\/setkab.go.id\/en\/trans-papua-road-construction-progresses-to-increase-connectivity\/","og_site_name":"Sekretariat Kabinet Republik Indonesia","article_publisher":"https:\/\/id-id.facebook.com\/Setkabgoid","article_published_time":"2021-09-25T05:52:12+00:00","article_modified_time":"2021-09-27T05:56:21+00:00","og_image":[{"width":1280,"height":958,"url":"https:\/\/setkab.go.id\/wp-content\/uploads\/2021\/09\/1-4.jpg","type":"image\/jpeg"}],"author":"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation","twitter_card":"summary_large_image","twitter_creator":"@setkabgoid","twitter_site":"@setkabgoid","twitter_misc":{"Written by":"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"NewsArticle","@id":"https:\/\/setkab.go.id\/en\/trans-papua-road-construction-progresses-to-increase-connectivity\/#article","isPartOf":{"@id":"https:\/\/setkab.go.id\/en\/trans-papua-road-construction-progresses-to-increase-connectivity\/"},"author":{"name":"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation","@id":"https:\/\/setkab.go.id\/#\/schema\/person\/ccc9c04099be79c6aa9ed45cb3bf345e"},"headline":"Trans-Papua Road Construction Progresses to Increase Connectivity","datePublished":"2021-09-25T05:52:12+00:00","dateModified":"2021-09-27T05:56:21+00:00","mainEntityOfPage":{"@id":"https:\/\/setkab.go.id\/en\/trans-papua-road-construction-progresses-to-increase-connectivity\/"},"wordCount":362,"commentCount":0,"publisher":{"@id":"https:\/\/setkab.go.id\/#organization"},"image":{"@id":"https:\/\/setkab.go.id\/en\/trans-papua-road-construction-progresses-to-increase-connectivity\/#primaryimage"},"thumbnailUrl":"https:\/\/setkab.go.id\/wp-content\/uploads\/2021\/09\/1-4.jpg","articleSection":["News","Uncategorized @en"],"inLanguage":"ENH","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/setkab.go.id\/en\/trans-papua-road-construction-progresses-to-increase-connectivity\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/setkab.go.id\/en\/trans-papua-road-construction-progresses-to-increase-connectivity\/","url":"https:\/\/setkab.go.id\/en\/trans-papua-road-construction-progresses-to-increase-connectivity\/","name":"Trans-Papua Road Construction Progresses to Increase Connectivity - Sekretariat Kabinet Republik Indonesia","isPartOf":{"@id":"https:\/\/setkab.go.id\/#website"},"primaryImageOfPage":{"@id":"https:\/\/setkab.go.id\/en\/trans-papua-road-construction-progresses-to-increase-connectivity\/#primaryimage"},"image":{"@id":"https:\/\/setkab.go.id\/en\/trans-papua-road-construction-progresses-to-increase-connectivity\/#primaryimage"},"thumbnailUrl":"https:\/\/setkab.go.id\/wp-content\/uploads\/2021\/09\/1-4.jpg","datePublished":"2021-09-25T05:52:12+00:00","dateModified":"2021-09-27T05:56:21+00:00","breadcrumb":{"@id":"https:\/\/setkab.go.id\/en\/trans-papua-road-construction-progresses-to-increase-connectivity\/#breadcrumb"},"inLanguage":"ENH","potentialAction":[{"@type":"ReadAction","target":["https:\/\/setkab.go.id\/en\/trans-papua-road-construction-progresses-to-increase-connectivity\/"]}]},{"@type":"ImageObject","inLanguage":"ENH","@id":"https:\/\/setkab.go.id\/en\/trans-papua-road-construction-progresses-to-increase-connectivity\/#primaryimage","url":"https:\/\/setkab.go.id\/wp-content\/uploads\/2021\/09\/1-4.jpg","contentUrl":"https:\/\/setkab.go.id\/wp-content\/uploads\/2021\/09\/1-4.jpg","width":1280,"height":958,"caption":"Special Staff to the President Billy Mambrasar during the inspection of Trans-Papua road construction. (Photo by: Team of Special Staff to the President Billy Mambrasar)"},{"@type":"BreadcrumbList","@id":"https:\/\/setkab.go.id\/en\/trans-papua-road-construction-progresses-to-increase-connectivity\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/setkab.go.id\/en\/"},{"@type":"ListItem","position":2,"name":"Trans-Papua Road Construction Progresses to Increase Connectivity"}]},{"@type":"WebSite","@id":"https:\/\/setkab.go.id\/#website","url":"https:\/\/setkab.go.id\/","name":"Sekretariat Kabinet Republik Indonesia","description":"Kabinet Merah Putih","publisher":{"@id":"https:\/\/setkab.go.id\/#organization"},"alternateName":"Setkab","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/setkab.go.id\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ENH"},{"@type":"Organization","@id":"https:\/\/setkab.go.id\/#organization","name":"Sekretariat Kabinet","alternateName":"Setkab","url":"https:\/\/setkab.go.id\/","logo":{"@type":"ImageObject","inLanguage":"ENH","@id":"https:\/\/setkab.go.id\/#\/schema\/logo\/image\/","url":"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/05\/garuda.png","contentUrl":"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/05\/garuda.png","width":720,"height":788,"caption":"Sekretariat Kabinet"},"image":{"@id":"https:\/\/setkab.go.id\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/id-id.facebook.com\/Setkabgoid","https:\/\/x.com\/setkabgoid","https:\/\/www.instagram.com\/sekretariat.kabinet\/","https:\/\/www.youtube.com\/channel\/UCey1BgbIUz6eVz2vywc2d7g","https:\/\/id.wikipedia.org\/wiki\/Sekretariat_Kabinet_Republik_Indonesia","https:\/\/www.tiktok.com\/@setkabgoid"]},{"@type":"Person","@id":"https:\/\/setkab.go.id\/#\/schema\/person\/ccc9c04099be79c6aa9ed45cb3bf345e","name":"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation","image":{"@type":"ImageObject","inLanguage":"ENH","@id":"https:\/\/setkab.go.id\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/8238a2781f78eec52de6cbadf268cdcab6067d59123790258ac87c2b257c0b3f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/8238a2781f78eec52de6cbadf268cdcab6067d59123790258ac87c2b257c0b3f?s=96&d=mm&r=g","caption":"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation"},"sameAs":["http:\/\/www.setkab.go.id"],"url":"https:\/\/setkab.go.id\/en\/author\/naster\/"}]}},"_links":{"self":[{"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/posts\/228142","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/users\/43"}],"replies":[{"embeddable":true,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/comments?post=228142"}],"version-history":[{"count":1,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/posts\/228142\/revisions"}],"predecessor-version":[{"id":228144,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/posts\/228142\/revisions\/228144"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/media\/228143"}],"wp:attachment":[{"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/media?parent=228142"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/categories?post=228142"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/tags?post=228142"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}