{"id":236508,"date":"2022-01-04T14:23:57","date_gmt":"2022-01-04T07:23:57","guid":{"rendered":"https:\/\/setkab.go.id\/?p=236508"},"modified":"2022-01-04T16:25:59","modified_gmt":"2022-01-04T09:25:59","slug":"randugunting-dam-construction-in-c-java-province-completed-ahead-of-schedule","status":"publish","type":"post","link":"https:\/\/setkab.go.id\/en\/randugunting-dam-construction-in-c-java-province-completed-ahead-of-schedule\/","title":{"rendered":"Randugunting Dam Construction in C. Java Province Completed Ahead of Schedule"},"content":{"rendered":"<div id=\"attachment_236470\" style=\"width: 310px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-236470\" class=\"wp-image-236470 size-medium\" src=\"https:\/\/setkab.go.id\/wp-content\/uploads\/2022\/01\/BENDUNGAN-RANDUGUNTING-300x200.jpeg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/setkab.go.id\/wp-content\/uploads\/2022\/01\/BENDUNGAN-RANDUGUNTING-300x200.jpeg 300w, https:\/\/setkab.go.id\/wp-content\/uploads\/2022\/01\/BENDUNGAN-RANDUGUNTING-345x230.jpeg 345w, https:\/\/setkab.go.id\/wp-content\/uploads\/2022\/01\/BENDUNGAN-RANDUGUNTING.jpeg 600w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><p id=\"caption-attachment-236470\" class=\"wp-caption-text\">Source: PR of Ministry of Public Works and Public Housing<\/p><\/div>\n<p>The physical construction of Randugunting Dam in Blora regency, Central Java province has been completed ahead of schedule.<\/p>\n<p>Minister of Public Works and Public Housing Basuki Hadimuljono expressed hope that the dam with a capacity of 14.43 million cubic meters can be inaugurated at the beginning of this month.<\/p>\n<p>\u201cThe dam was finished 10 months earlier than [planned] in the contract in 2022. Overall, the dam [construction] has been completed. We only have to tidy up the building and landscape. I hope it can be inaugurated by the President at the beginning of January 2022,\u201d the Minister said, quoted from the official website of Ministry of Public Works and Public Housing, Tuesday (01\/04).<\/p>\n<p>For the record, the dam was constructed from 2018 to 2022 with a contract value of Rp880 billion financed by the State Budget. The process went well without any technical issues with construction or social issues with land acquisition.<\/p>\n<p>Basuki also pointed out that Randugunting Dam has been planned to increase water supplies for dry areas in Blora and Rembang regencies since the 1990s.<\/p>\n<p>\u201cWe are aware that Blora and Rembang are vulnerable to shortage of water. This dam will be able to provide raw water supply [with a flow rate of] 200 liters\/second and irrigate 670 hectares [of land]. It can also be used as a tourist destination,\u201d he said.<\/p>\n<p>In addition to being a source of raw water and irrigation, the dam with an inundation area of 187.19 hectares also serves to reduce flood by 75 percent or 81 cubic meters per second, reducing flood-affected area from 4,604 hectares to 2,285 hectares.<\/p>\n<p>Randugunting Dam also has a potential to become a solar power plant with a solar panel system.<\/p>\n<p>\u201cThis dam has a potential for solar energy, so we will try to install floating solar panel on the dam. To date, we have 231 dams. If added with 61 dams that will be finished constructed in 2024, we will have 292 dams. If we install floating solar panels on all dams, renewable energy can be developed [from dams],\u201d he remarked. <strong>(PR of Ministry of Public Works and Public Housing\/UN) (DH\/MMB)<\/strong><\/p>\n<p><strong>Help us improve information service by filling out a survey on <a href=\"http:\/\/setkab.go.id\/skm-1\">this link<\/a>. Thank you!<\/strong><\/p>\n<p><strong>The official website of Ministry of Public Works and Public Housing can be accessed through <a href=\"https:\/\/www.pu.go.id\/\">this link<\/a>. <\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The physical construction of Randugunting Dam in Blora regency, Central Java province has been completed ahead of schedule. Minister of Public Works and Public Housing Basuki Hadimuljono expressed hope that the dam with a capacity of 14.43 million cubic meters can be inaugurated at the beginning of this month. \u201cThe dam was finished 10 months [&hellip;]<\/p>\n","protected":false},"author":43,"featured_media":236470,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[77],"tags":[],"class_list":["post-236508","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v24.1 (Yoast SEO v26.1.1) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Randugunting Dam Construction in C. Java Province Completed Ahead of Schedule - Sekretariat Kabinet Republik Indonesia<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/setkab.go.id\/en\/randugunting-dam-construction-in-c-java-province-completed-ahead-of-schedule\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Randugunting Dam Construction in C. Java Province Completed Ahead of Schedule - Sekretariat Kabinet Republik Indonesia\" \/>\n<meta property=\"og:description\" content=\"The physical construction of Randugunting Dam in Blora regency, Central Java province has been completed ahead of schedule. Minister of Public Works and Public Housing Basuki Hadimuljono expressed hope that the dam with a capacity of 14.43 million cubic meters can be inaugurated at the beginning of this month. \u201cThe dam was finished 10 months [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/setkab.go.id\/en\/randugunting-dam-construction-in-c-java-province-completed-ahead-of-schedule\/\" \/>\n<meta property=\"og:site_name\" content=\"Sekretariat Kabinet Republik Indonesia\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/id-id.facebook.com\/Setkabgoid\" \/>\n<meta property=\"article:published_time\" content=\"2022-01-04T07:23:57+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-01-04T09:25:59+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/setkab.go.id\/wp-content\/uploads\/2022\/01\/BENDUNGAN-RANDUGUNTING.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"600\" \/>\n\t<meta property=\"og:image:height\" content=\"400\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@setkabgoid\" \/>\n<meta name=\"twitter:site\" content=\"@setkabgoid\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"NewsArticle\",\"@id\":\"https:\/\/setkab.go.id\/en\/randugunting-dam-construction-in-c-java-province-completed-ahead-of-schedule\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/setkab.go.id\/en\/randugunting-dam-construction-in-c-java-province-completed-ahead-of-schedule\/\"},\"author\":{\"name\":\"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation\",\"@id\":\"https:\/\/setkab.go.id\/#\/schema\/person\/ccc9c04099be79c6aa9ed45cb3bf345e\"},\"headline\":\"Randugunting Dam Construction in C. Java Province Completed Ahead of Schedule\",\"datePublished\":\"2022-01-04T07:23:57+00:00\",\"dateModified\":\"2022-01-04T09:25:59+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/setkab.go.id\/en\/randugunting-dam-construction-in-c-java-province-completed-ahead-of-schedule\/\"},\"wordCount\":400,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/setkab.go.id\/#organization\"},\"image\":{\"@id\":\"https:\/\/setkab.go.id\/en\/randugunting-dam-construction-in-c-java-province-completed-ahead-of-schedule\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/setkab.go.id\/wp-content\/uploads\/2022\/01\/BENDUNGAN-RANDUGUNTING.jpeg\",\"articleSection\":[\"News\"],\"inLanguage\":\"ENH\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/setkab.go.id\/en\/randugunting-dam-construction-in-c-java-province-completed-ahead-of-schedule\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/setkab.go.id\/en\/randugunting-dam-construction-in-c-java-province-completed-ahead-of-schedule\/\",\"url\":\"https:\/\/setkab.go.id\/en\/randugunting-dam-construction-in-c-java-province-completed-ahead-of-schedule\/\",\"name\":\"Randugunting Dam Construction in C. Java Province Completed Ahead of Schedule - Sekretariat Kabinet Republik Indonesia\",\"isPartOf\":{\"@id\":\"https:\/\/setkab.go.id\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/setkab.go.id\/en\/randugunting-dam-construction-in-c-java-province-completed-ahead-of-schedule\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/setkab.go.id\/en\/randugunting-dam-construction-in-c-java-province-completed-ahead-of-schedule\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/setkab.go.id\/wp-content\/uploads\/2022\/01\/BENDUNGAN-RANDUGUNTING.jpeg\",\"datePublished\":\"2022-01-04T07:23:57+00:00\",\"dateModified\":\"2022-01-04T09:25:59+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/setkab.go.id\/en\/randugunting-dam-construction-in-c-java-province-completed-ahead-of-schedule\/#breadcrumb\"},\"inLanguage\":\"ENH\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/setkab.go.id\/en\/randugunting-dam-construction-in-c-java-province-completed-ahead-of-schedule\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ENH\",\"@id\":\"https:\/\/setkab.go.id\/en\/randugunting-dam-construction-in-c-java-province-completed-ahead-of-schedule\/#primaryimage\",\"url\":\"https:\/\/setkab.go.id\/wp-content\/uploads\/2022\/01\/BENDUNGAN-RANDUGUNTING.jpeg\",\"contentUrl\":\"https:\/\/setkab.go.id\/wp-content\/uploads\/2022\/01\/BENDUNGAN-RANDUGUNTING.jpeg\",\"width\":600,\"height\":400,\"caption\":\"Sumber: Humas Kementerian PUPR\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/setkab.go.id\/en\/randugunting-dam-construction-in-c-java-province-completed-ahead-of-schedule\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/setkab.go.id\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Randugunting Dam Construction in C. Java Province Completed Ahead of Schedule\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/setkab.go.id\/#website\",\"url\":\"https:\/\/setkab.go.id\/\",\"name\":\"Sekretariat Kabinet Republik Indonesia\",\"description\":\"Kabinet Merah Putih\",\"publisher\":{\"@id\":\"https:\/\/setkab.go.id\/#organization\"},\"alternateName\":\"Setkab\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/setkab.go.id\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ENH\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/setkab.go.id\/#organization\",\"name\":\"Sekretariat Kabinet\",\"alternateName\":\"Setkab\",\"url\":\"https:\/\/setkab.go.id\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ENH\",\"@id\":\"https:\/\/setkab.go.id\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/05\/garuda.png\",\"contentUrl\":\"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/05\/garuda.png\",\"width\":720,\"height\":788,\"caption\":\"Sekretariat Kabinet\"},\"image\":{\"@id\":\"https:\/\/setkab.go.id\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/id-id.facebook.com\/Setkabgoid\",\"https:\/\/x.com\/setkabgoid\",\"https:\/\/www.instagram.com\/sekretariat.kabinet\/\",\"https:\/\/www.youtube.com\/channel\/UCey1BgbIUz6eVz2vywc2d7g\",\"https:\/\/id.wikipedia.org\/wiki\/Sekretariat_Kabinet_Republik_Indonesia\",\"https:\/\/www.tiktok.com\/@setkabgoid\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/setkab.go.id\/#\/schema\/person\/ccc9c04099be79c6aa9ed45cb3bf345e\",\"name\":\"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ENH\",\"@id\":\"https:\/\/setkab.go.id\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/8238a2781f78eec52de6cbadf268cdcab6067d59123790258ac87c2b257c0b3f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/8238a2781f78eec52de6cbadf268cdcab6067d59123790258ac87c2b257c0b3f?s=96&d=mm&r=g\",\"caption\":\"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation\"},\"sameAs\":[\"http:\/\/www.setkab.go.id\"],\"url\":\"https:\/\/setkab.go.id\/en\/author\/naster\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Randugunting Dam Construction in C. Java Province Completed Ahead of Schedule - Sekretariat Kabinet Republik Indonesia","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/setkab.go.id\/en\/randugunting-dam-construction-in-c-java-province-completed-ahead-of-schedule\/","og_locale":"en_US","og_type":"article","og_title":"Randugunting Dam Construction in C. Java Province Completed Ahead of Schedule - Sekretariat Kabinet Republik Indonesia","og_description":"The physical construction of Randugunting Dam in Blora regency, Central Java province has been completed ahead of schedule. Minister of Public Works and Public Housing Basuki Hadimuljono expressed hope that the dam with a capacity of 14.43 million cubic meters can be inaugurated at the beginning of this month. \u201cThe dam was finished 10 months [&hellip;]","og_url":"https:\/\/setkab.go.id\/en\/randugunting-dam-construction-in-c-java-province-completed-ahead-of-schedule\/","og_site_name":"Sekretariat Kabinet Republik Indonesia","article_publisher":"https:\/\/id-id.facebook.com\/Setkabgoid","article_published_time":"2022-01-04T07:23:57+00:00","article_modified_time":"2022-01-04T09:25:59+00:00","og_image":[{"width":600,"height":400,"url":"https:\/\/setkab.go.id\/wp-content\/uploads\/2022\/01\/BENDUNGAN-RANDUGUNTING.jpeg","type":"image\/jpeg"}],"author":"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation","twitter_card":"summary_large_image","twitter_creator":"@setkabgoid","twitter_site":"@setkabgoid","twitter_misc":{"Written by":"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"NewsArticle","@id":"https:\/\/setkab.go.id\/en\/randugunting-dam-construction-in-c-java-province-completed-ahead-of-schedule\/#article","isPartOf":{"@id":"https:\/\/setkab.go.id\/en\/randugunting-dam-construction-in-c-java-province-completed-ahead-of-schedule\/"},"author":{"name":"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation","@id":"https:\/\/setkab.go.id\/#\/schema\/person\/ccc9c04099be79c6aa9ed45cb3bf345e"},"headline":"Randugunting Dam Construction in C. Java Province Completed Ahead of Schedule","datePublished":"2022-01-04T07:23:57+00:00","dateModified":"2022-01-04T09:25:59+00:00","mainEntityOfPage":{"@id":"https:\/\/setkab.go.id\/en\/randugunting-dam-construction-in-c-java-province-completed-ahead-of-schedule\/"},"wordCount":400,"commentCount":0,"publisher":{"@id":"https:\/\/setkab.go.id\/#organization"},"image":{"@id":"https:\/\/setkab.go.id\/en\/randugunting-dam-construction-in-c-java-province-completed-ahead-of-schedule\/#primaryimage"},"thumbnailUrl":"https:\/\/setkab.go.id\/wp-content\/uploads\/2022\/01\/BENDUNGAN-RANDUGUNTING.jpeg","articleSection":["News"],"inLanguage":"ENH","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/setkab.go.id\/en\/randugunting-dam-construction-in-c-java-province-completed-ahead-of-schedule\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/setkab.go.id\/en\/randugunting-dam-construction-in-c-java-province-completed-ahead-of-schedule\/","url":"https:\/\/setkab.go.id\/en\/randugunting-dam-construction-in-c-java-province-completed-ahead-of-schedule\/","name":"Randugunting Dam Construction in C. Java Province Completed Ahead of Schedule - Sekretariat Kabinet Republik Indonesia","isPartOf":{"@id":"https:\/\/setkab.go.id\/#website"},"primaryImageOfPage":{"@id":"https:\/\/setkab.go.id\/en\/randugunting-dam-construction-in-c-java-province-completed-ahead-of-schedule\/#primaryimage"},"image":{"@id":"https:\/\/setkab.go.id\/en\/randugunting-dam-construction-in-c-java-province-completed-ahead-of-schedule\/#primaryimage"},"thumbnailUrl":"https:\/\/setkab.go.id\/wp-content\/uploads\/2022\/01\/BENDUNGAN-RANDUGUNTING.jpeg","datePublished":"2022-01-04T07:23:57+00:00","dateModified":"2022-01-04T09:25:59+00:00","breadcrumb":{"@id":"https:\/\/setkab.go.id\/en\/randugunting-dam-construction-in-c-java-province-completed-ahead-of-schedule\/#breadcrumb"},"inLanguage":"ENH","potentialAction":[{"@type":"ReadAction","target":["https:\/\/setkab.go.id\/en\/randugunting-dam-construction-in-c-java-province-completed-ahead-of-schedule\/"]}]},{"@type":"ImageObject","inLanguage":"ENH","@id":"https:\/\/setkab.go.id\/en\/randugunting-dam-construction-in-c-java-province-completed-ahead-of-schedule\/#primaryimage","url":"https:\/\/setkab.go.id\/wp-content\/uploads\/2022\/01\/BENDUNGAN-RANDUGUNTING.jpeg","contentUrl":"https:\/\/setkab.go.id\/wp-content\/uploads\/2022\/01\/BENDUNGAN-RANDUGUNTING.jpeg","width":600,"height":400,"caption":"Sumber: Humas Kementerian PUPR"},{"@type":"BreadcrumbList","@id":"https:\/\/setkab.go.id\/en\/randugunting-dam-construction-in-c-java-province-completed-ahead-of-schedule\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/setkab.go.id\/en\/"},{"@type":"ListItem","position":2,"name":"Randugunting Dam Construction in C. Java Province Completed Ahead of Schedule"}]},{"@type":"WebSite","@id":"https:\/\/setkab.go.id\/#website","url":"https:\/\/setkab.go.id\/","name":"Sekretariat Kabinet Republik Indonesia","description":"Kabinet Merah Putih","publisher":{"@id":"https:\/\/setkab.go.id\/#organization"},"alternateName":"Setkab","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/setkab.go.id\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ENH"},{"@type":"Organization","@id":"https:\/\/setkab.go.id\/#organization","name":"Sekretariat Kabinet","alternateName":"Setkab","url":"https:\/\/setkab.go.id\/","logo":{"@type":"ImageObject","inLanguage":"ENH","@id":"https:\/\/setkab.go.id\/#\/schema\/logo\/image\/","url":"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/05\/garuda.png","contentUrl":"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/05\/garuda.png","width":720,"height":788,"caption":"Sekretariat Kabinet"},"image":{"@id":"https:\/\/setkab.go.id\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/id-id.facebook.com\/Setkabgoid","https:\/\/x.com\/setkabgoid","https:\/\/www.instagram.com\/sekretariat.kabinet\/","https:\/\/www.youtube.com\/channel\/UCey1BgbIUz6eVz2vywc2d7g","https:\/\/id.wikipedia.org\/wiki\/Sekretariat_Kabinet_Republik_Indonesia","https:\/\/www.tiktok.com\/@setkabgoid"]},{"@type":"Person","@id":"https:\/\/setkab.go.id\/#\/schema\/person\/ccc9c04099be79c6aa9ed45cb3bf345e","name":"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation","image":{"@type":"ImageObject","inLanguage":"ENH","@id":"https:\/\/setkab.go.id\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/8238a2781f78eec52de6cbadf268cdcab6067d59123790258ac87c2b257c0b3f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/8238a2781f78eec52de6cbadf268cdcab6067d59123790258ac87c2b257c0b3f?s=96&d=mm&r=g","caption":"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation"},"sameAs":["http:\/\/www.setkab.go.id"],"url":"https:\/\/setkab.go.id\/en\/author\/naster\/"}]}},"_links":{"self":[{"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/posts\/236508","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/users\/43"}],"replies":[{"embeddable":true,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/comments?post=236508"}],"version-history":[{"count":1,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/posts\/236508\/revisions"}],"predecessor-version":[{"id":236509,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/posts\/236508\/revisions\/236509"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/media\/236470"}],"wp:attachment":[{"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/media?parent=236508"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/categories?post=236508"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/tags?post=236508"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}