{"id":245616,"date":"2022-04-22T10:00:51","date_gmt":"2022-04-22T03:00:51","guid":{"rendered":"https:\/\/setkab.go.id\/?p=245616"},"modified":"2022-04-22T15:11:22","modified_gmt":"2022-04-22T08:11:22","slug":"govt-to-complete-sepaku-semoi-dam-by-2023","status":"publish","type":"post","link":"https:\/\/setkab.go.id\/en\/govt-to-complete-sepaku-semoi-dam-by-2023\/","title":{"rendered":"Gov\u2019t to Complete Sepaku Semoi Dam by 2023"},"content":{"rendered":"<div id=\"attachment_245617\" style=\"width: 1290px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-245617\" class=\"size-full wp-image-245617\" src=\"https:\/\/setkab.go.id\/wp-content\/uploads\/2022\/04\/22April.jpeg\" alt=\"\" width=\"1280\" height=\"852\" \/><p id=\"caption-attachment-245617\" class=\"wp-caption-text\">Ground zero of New Capital of Nusantara (IKN). (Photo by: PR\/ Rahmat))<\/p><\/div>\n<p>In a bid to provide raw water and flood management in New Capital of Nusantara (IKN), the Government through Ministry of Public Works and Public Housing is speeding up the construction of Sepaku Semoi Dam in North Penajam Paser regency, East Kalimantan province.<\/p>\n<p>The construction work is expected to be completed by 2023 and the first impounding of the dam will be carried out in mid-2023.<\/p>\n<p>Minister of Public Works and Public Housing Basuki Hadimuljono, Friday (04\/22), said that Sepaku Semoi Dam will be able to provide raw water for the IKN until 2030. In the future, the Ministry will also build other two dams, namely Batu Lepek and Selamayu Dams and will come out with the design of drainage system as flood management in the IKN.<\/p>\n<p>The Minister went on to say that the dam which has an inundation area of 280 hectares and can accommodate 10.6 million cubic meters was initially planned to provide raw water to Balikpapan city. Now, to support capital relocation the dam is also expected to provide raw water supply to the IKN with a flow rate of 2,500 liters per second and to reduce flood by 55 percent.<\/p>\n<p>To date, the construction progress of Sepaku Semoi Dam with a contract value of Rp556 billion has reached 45 percent.<strong> (PR of Ministry of Public Works and Public Housing\/UN) (RAS\/MMB)<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>In a bid to provide raw water and flood management in New Capital of Nusantara (IKN), the Government through Ministry of Public Works and Public Housing is speeding up the construction of Sepaku Semoi Dam in North Penajam Paser regency, East Kalimantan province. The construction work is expected to be completed by 2023 and the [&hellip;]<\/p>\n","protected":false},"author":43,"featured_media":245617,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[77],"tags":[],"class_list":["post-245616","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v24.1 (Yoast SEO v26.1.1) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Gov\u2019t to Complete Sepaku Semoi Dam by 2023 - Sekretariat Kabinet Republik Indonesia<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/setkab.go.id\/en\/govt-to-complete-sepaku-semoi-dam-by-2023\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Gov\u2019t to Complete Sepaku Semoi Dam by 2023 - Sekretariat Kabinet Republik Indonesia\" \/>\n<meta property=\"og:description\" content=\"In a bid to provide raw water and flood management in New Capital of Nusantara (IKN), the Government through Ministry of Public Works and Public Housing is speeding up the construction of Sepaku Semoi Dam in North Penajam Paser regency, East Kalimantan province. The construction work is expected to be completed by 2023 and the [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/setkab.go.id\/en\/govt-to-complete-sepaku-semoi-dam-by-2023\/\" \/>\n<meta property=\"og:site_name\" content=\"Sekretariat Kabinet Republik Indonesia\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/id-id.facebook.com\/Setkabgoid\" \/>\n<meta property=\"article:published_time\" content=\"2022-04-22T03:00:51+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-04-22T08:11:22+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/setkab.go.id\/wp-content\/uploads\/2022\/04\/22April.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"1280\" \/>\n\t<meta property=\"og:image:height\" content=\"852\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@setkabgoid\" \/>\n<meta name=\"twitter:site\" content=\"@setkabgoid\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"NewsArticle\",\"@id\":\"https:\/\/setkab.go.id\/en\/govt-to-complete-sepaku-semoi-dam-by-2023\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/setkab.go.id\/en\/govt-to-complete-sepaku-semoi-dam-by-2023\/\"},\"author\":{\"name\":\"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation\",\"@id\":\"https:\/\/setkab.go.id\/#\/schema\/person\/ccc9c04099be79c6aa9ed45cb3bf345e\"},\"headline\":\"Gov\u2019t to Complete Sepaku Semoi Dam by 2023\",\"datePublished\":\"2022-04-22T03:00:51+00:00\",\"dateModified\":\"2022-04-22T08:11:22+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/setkab.go.id\/en\/govt-to-complete-sepaku-semoi-dam-by-2023\/\"},\"wordCount\":246,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/setkab.go.id\/#organization\"},\"image\":{\"@id\":\"https:\/\/setkab.go.id\/en\/govt-to-complete-sepaku-semoi-dam-by-2023\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/setkab.go.id\/wp-content\/uploads\/2022\/04\/22April.jpeg\",\"articleSection\":[\"News\"],\"inLanguage\":\"ENH\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/setkab.go.id\/en\/govt-to-complete-sepaku-semoi-dam-by-2023\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/setkab.go.id\/en\/govt-to-complete-sepaku-semoi-dam-by-2023\/\",\"url\":\"https:\/\/setkab.go.id\/en\/govt-to-complete-sepaku-semoi-dam-by-2023\/\",\"name\":\"Gov\u2019t to Complete Sepaku Semoi Dam by 2023 - Sekretariat Kabinet Republik Indonesia\",\"isPartOf\":{\"@id\":\"https:\/\/setkab.go.id\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/setkab.go.id\/en\/govt-to-complete-sepaku-semoi-dam-by-2023\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/setkab.go.id\/en\/govt-to-complete-sepaku-semoi-dam-by-2023\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/setkab.go.id\/wp-content\/uploads\/2022\/04\/22April.jpeg\",\"datePublished\":\"2022-04-22T03:00:51+00:00\",\"dateModified\":\"2022-04-22T08:11:22+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/setkab.go.id\/en\/govt-to-complete-sepaku-semoi-dam-by-2023\/#breadcrumb\"},\"inLanguage\":\"ENH\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/setkab.go.id\/en\/govt-to-complete-sepaku-semoi-dam-by-2023\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ENH\",\"@id\":\"https:\/\/setkab.go.id\/en\/govt-to-complete-sepaku-semoi-dam-by-2023\/#primaryimage\",\"url\":\"https:\/\/setkab.go.id\/wp-content\/uploads\/2022\/04\/22April.jpeg\",\"contentUrl\":\"https:\/\/setkab.go.id\/wp-content\/uploads\/2022\/04\/22April.jpeg\",\"width\":1280,\"height\":852,\"caption\":\"Ground zero of New Capital of Nusantara (IKN). (Photo by: PR\/ Rahmat))\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/setkab.go.id\/en\/govt-to-complete-sepaku-semoi-dam-by-2023\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/setkab.go.id\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Gov\u2019t to Complete Sepaku Semoi Dam by 2023\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/setkab.go.id\/#website\",\"url\":\"https:\/\/setkab.go.id\/\",\"name\":\"Sekretariat Kabinet Republik Indonesia\",\"description\":\"Kabinet Merah Putih\",\"publisher\":{\"@id\":\"https:\/\/setkab.go.id\/#organization\"},\"alternateName\":\"Setkab\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/setkab.go.id\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ENH\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/setkab.go.id\/#organization\",\"name\":\"Sekretariat Kabinet\",\"alternateName\":\"Setkab\",\"url\":\"https:\/\/setkab.go.id\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ENH\",\"@id\":\"https:\/\/setkab.go.id\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/05\/garuda.png\",\"contentUrl\":\"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/05\/garuda.png\",\"width\":720,\"height\":788,\"caption\":\"Sekretariat Kabinet\"},\"image\":{\"@id\":\"https:\/\/setkab.go.id\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/id-id.facebook.com\/Setkabgoid\",\"https:\/\/x.com\/setkabgoid\",\"https:\/\/www.instagram.com\/sekretariat.kabinet\/\",\"https:\/\/www.youtube.com\/channel\/UCey1BgbIUz6eVz2vywc2d7g\",\"https:\/\/id.wikipedia.org\/wiki\/Sekretariat_Kabinet_Republik_Indonesia\",\"https:\/\/www.tiktok.com\/@setkabgoid\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/setkab.go.id\/#\/schema\/person\/ccc9c04099be79c6aa9ed45cb3bf345e\",\"name\":\"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ENH\",\"@id\":\"https:\/\/setkab.go.id\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/8238a2781f78eec52de6cbadf268cdcab6067d59123790258ac87c2b257c0b3f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/8238a2781f78eec52de6cbadf268cdcab6067d59123790258ac87c2b257c0b3f?s=96&d=mm&r=g\",\"caption\":\"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation\"},\"sameAs\":[\"http:\/\/www.setkab.go.id\"],\"url\":\"https:\/\/setkab.go.id\/en\/author\/naster\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Gov\u2019t to Complete Sepaku Semoi Dam by 2023 - Sekretariat Kabinet Republik Indonesia","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/setkab.go.id\/en\/govt-to-complete-sepaku-semoi-dam-by-2023\/","og_locale":"en_US","og_type":"article","og_title":"Gov\u2019t to Complete Sepaku Semoi Dam by 2023 - Sekretariat Kabinet Republik Indonesia","og_description":"In a bid to provide raw water and flood management in New Capital of Nusantara (IKN), the Government through Ministry of Public Works and Public Housing is speeding up the construction of Sepaku Semoi Dam in North Penajam Paser regency, East Kalimantan province. The construction work is expected to be completed by 2023 and the [&hellip;]","og_url":"https:\/\/setkab.go.id\/en\/govt-to-complete-sepaku-semoi-dam-by-2023\/","og_site_name":"Sekretariat Kabinet Republik Indonesia","article_publisher":"https:\/\/id-id.facebook.com\/Setkabgoid","article_published_time":"2022-04-22T03:00:51+00:00","article_modified_time":"2022-04-22T08:11:22+00:00","og_image":[{"width":1280,"height":852,"url":"https:\/\/setkab.go.id\/wp-content\/uploads\/2022\/04\/22April.jpeg","type":"image\/jpeg"}],"author":"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation","twitter_card":"summary_large_image","twitter_creator":"@setkabgoid","twitter_site":"@setkabgoid","twitter_misc":{"Written by":"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"NewsArticle","@id":"https:\/\/setkab.go.id\/en\/govt-to-complete-sepaku-semoi-dam-by-2023\/#article","isPartOf":{"@id":"https:\/\/setkab.go.id\/en\/govt-to-complete-sepaku-semoi-dam-by-2023\/"},"author":{"name":"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation","@id":"https:\/\/setkab.go.id\/#\/schema\/person\/ccc9c04099be79c6aa9ed45cb3bf345e"},"headline":"Gov\u2019t to Complete Sepaku Semoi Dam by 2023","datePublished":"2022-04-22T03:00:51+00:00","dateModified":"2022-04-22T08:11:22+00:00","mainEntityOfPage":{"@id":"https:\/\/setkab.go.id\/en\/govt-to-complete-sepaku-semoi-dam-by-2023\/"},"wordCount":246,"commentCount":0,"publisher":{"@id":"https:\/\/setkab.go.id\/#organization"},"image":{"@id":"https:\/\/setkab.go.id\/en\/govt-to-complete-sepaku-semoi-dam-by-2023\/#primaryimage"},"thumbnailUrl":"https:\/\/setkab.go.id\/wp-content\/uploads\/2022\/04\/22April.jpeg","articleSection":["News"],"inLanguage":"ENH","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/setkab.go.id\/en\/govt-to-complete-sepaku-semoi-dam-by-2023\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/setkab.go.id\/en\/govt-to-complete-sepaku-semoi-dam-by-2023\/","url":"https:\/\/setkab.go.id\/en\/govt-to-complete-sepaku-semoi-dam-by-2023\/","name":"Gov\u2019t to Complete Sepaku Semoi Dam by 2023 - Sekretariat Kabinet Republik Indonesia","isPartOf":{"@id":"https:\/\/setkab.go.id\/#website"},"primaryImageOfPage":{"@id":"https:\/\/setkab.go.id\/en\/govt-to-complete-sepaku-semoi-dam-by-2023\/#primaryimage"},"image":{"@id":"https:\/\/setkab.go.id\/en\/govt-to-complete-sepaku-semoi-dam-by-2023\/#primaryimage"},"thumbnailUrl":"https:\/\/setkab.go.id\/wp-content\/uploads\/2022\/04\/22April.jpeg","datePublished":"2022-04-22T03:00:51+00:00","dateModified":"2022-04-22T08:11:22+00:00","breadcrumb":{"@id":"https:\/\/setkab.go.id\/en\/govt-to-complete-sepaku-semoi-dam-by-2023\/#breadcrumb"},"inLanguage":"ENH","potentialAction":[{"@type":"ReadAction","target":["https:\/\/setkab.go.id\/en\/govt-to-complete-sepaku-semoi-dam-by-2023\/"]}]},{"@type":"ImageObject","inLanguage":"ENH","@id":"https:\/\/setkab.go.id\/en\/govt-to-complete-sepaku-semoi-dam-by-2023\/#primaryimage","url":"https:\/\/setkab.go.id\/wp-content\/uploads\/2022\/04\/22April.jpeg","contentUrl":"https:\/\/setkab.go.id\/wp-content\/uploads\/2022\/04\/22April.jpeg","width":1280,"height":852,"caption":"Ground zero of New Capital of Nusantara (IKN). (Photo by: PR\/ Rahmat))"},{"@type":"BreadcrumbList","@id":"https:\/\/setkab.go.id\/en\/govt-to-complete-sepaku-semoi-dam-by-2023\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/setkab.go.id\/en\/"},{"@type":"ListItem","position":2,"name":"Gov\u2019t to Complete Sepaku Semoi Dam by 2023"}]},{"@type":"WebSite","@id":"https:\/\/setkab.go.id\/#website","url":"https:\/\/setkab.go.id\/","name":"Sekretariat Kabinet Republik Indonesia","description":"Kabinet Merah Putih","publisher":{"@id":"https:\/\/setkab.go.id\/#organization"},"alternateName":"Setkab","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/setkab.go.id\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ENH"},{"@type":"Organization","@id":"https:\/\/setkab.go.id\/#organization","name":"Sekretariat Kabinet","alternateName":"Setkab","url":"https:\/\/setkab.go.id\/","logo":{"@type":"ImageObject","inLanguage":"ENH","@id":"https:\/\/setkab.go.id\/#\/schema\/logo\/image\/","url":"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/05\/garuda.png","contentUrl":"https:\/\/setkab.go.id\/wp-content\/uploads\/2020\/05\/garuda.png","width":720,"height":788,"caption":"Sekretariat Kabinet"},"image":{"@id":"https:\/\/setkab.go.id\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/id-id.facebook.com\/Setkabgoid","https:\/\/x.com\/setkabgoid","https:\/\/www.instagram.com\/sekretariat.kabinet\/","https:\/\/www.youtube.com\/channel\/UCey1BgbIUz6eVz2vywc2d7g","https:\/\/id.wikipedia.org\/wiki\/Sekretariat_Kabinet_Republik_Indonesia","https:\/\/www.tiktok.com\/@setkabgoid"]},{"@type":"Person","@id":"https:\/\/setkab.go.id\/#\/schema\/person\/ccc9c04099be79c6aa9ed45cb3bf345e","name":"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation","image":{"@type":"ImageObject","inLanguage":"ENH","@id":"https:\/\/setkab.go.id\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/8238a2781f78eec52de6cbadf268cdcab6067d59123790258ac87c2b257c0b3f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/8238a2781f78eec52de6cbadf268cdcab6067d59123790258ac87c2b257c0b3f?s=96&d=mm&r=g","caption":"Office of Assistant to Deputy Cabinet Secretary for State Documents &amp; Translation"},"sameAs":["http:\/\/www.setkab.go.id"],"url":"https:\/\/setkab.go.id\/en\/author\/naster\/"}]}},"_links":{"self":[{"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/posts\/245616","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/users\/43"}],"replies":[{"embeddable":true,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/comments?post=245616"}],"version-history":[{"count":1,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/posts\/245616\/revisions"}],"predecessor-version":[{"id":245619,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/posts\/245616\/revisions\/245619"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/media\/245617"}],"wp:attachment":[{"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/media?parent=245616"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/categories?post=245616"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/setkab.go.id\/en\/api\/wp\/v2\/tags?post=245616"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}